How Much to Charge for Painting: Per Square Foot, Per Hour, Per Room
Short answer: On the worked interior repaint below — three bedrooms and a hallway, walls and ceilings in two coats, plus trim and doors — the right price is $5,420, which is about $2.69 per square foot of painted surface and $104 per hour of work. How much to charge for painting is a calculation, not a lookup.
⚡ Instant Contractor Toolkit (
🔗 Embed / CSV Template+100% Free Unlimited App): Open the Interactive Contractor Invoice & Work Order Generator (or click🔗 Embed / CSV Template), email mert@usekeelapp.com for Free.keelData Setup, explore the Contractor App Store Edition, or Download Keel on the App Store ($0/moCore Plan) to manage estimates, invoices, job-site receipts, and IRS mileage offline on iPhone.
Measure wall area as perimeter times ceiling height minus openings, convert to gallons at 350 to 400 square feet per gallon per coat, estimate hours at your own production rates, multiply those hours by your burdened labor cost, add overhead per billable hour, then divide the total by one minus your target margin. Adding a percentage to cost is markup, and it keeps less than you think.
There is no national price for a paint job, and any page that hands you one is selling you somebody else’s cost structure. What travels between markets is the arithmetic: unit, quantity, hours, cost per hour, overhead, margin. Run it once with your own numbers and you can quote anything from a hallway to a two-story exterior without guessing. The lines you build along the way become the ones on the bill, which is why they should already read like what an invoice needs while you are still on the walkthrough.
What unit should I price painting in?
The single most expensive mistake in this trade is pricing off floor area. An 8-foot ceiling and a 10-foot ceiling in the same footprint are two different jobs, and the customer quoting you “1,800 square feet” over the phone is describing neither of them.
| Job | The unit to price it in | Why that unit |
|---|---|---|
| Interior walls | Net wall square feet | Floor area ignores ceiling height entirely |
| Repeat or tract interiors | Per room, derived from your own wall-area history | Faster once the rooms actually repeat |
| Ceilings | Floor square feet | Different paint, overhead reach, slower per foot |
| Trim, base, crown | Linear feet | Cut work does not scale with wall area |
| Doors, windows, shutters | Per unit | Fixed time each, regardless of room size |
| Exterior siding | Wall square feet plus a story and access factor | Ladders and staging are hours, not area |
| Kitchen cabinets | Per door, per drawer front, per box | The doors are the job; the boxes are the smaller half |
Cabinets deserve the separate treatment. A kitchen with 22 doors and 9 drawer fronts is 31 pieces that each get degreased, sanded, primed, and sprayed on two sides with dry time between every step. Counting cabinets in square feet buries that.
How do I get the wall square footage?
Perimeter times ceiling height, minus the openings. Add the four wall lengths, multiply by the height, then deduct doors and windows over about 15 square feet and ignore anything smaller — the surface you save is paid back in cutting around it. A 12 by 14 foot room with 8-foot ceilings has a 52-foot perimeter and 416 gross square feet of wall before deductions.
For a whole house, take the takeoff room by room and total the columns. Doing it that way gives you ceiling area and baseboard footage for free, and those are separate lines with separate rates.
| Room | Perimeter × height | Gross wall | Openings | Net wall | Ceiling | Base |
|---|---|---|---|---|---|---|
| Bedroom 1, 13 × 15 | 56 × 9 | 504 | 86 | 418 | 195 | 48 lf |
| Bedroom 2, 11 × 12 | 46 × 9 | 414 | 57 | 357 | 132 | 40 lf |
| Bedroom 3, 10 × 12 | 44 × 9 | 396 | 57 | 339 | 120 | 38 lf |
| Hallway, 4 × 22 | 52 × 9 | 468 | 105 | 363 | 88 | 37 lf |
| Total | 1,782 | 305 | 1,477 | 535 | 163 lf |
How much paint does that square footage need?
The label says 350 to 400 square feet per gallon per coat. That figure assumes smooth, sealed, previously painted drywall and a roller. The surface in front of you decides how much of it you actually get.
| What you are painting over | What it does to the label figure |
|---|---|
| Smooth, sealed, previously painted | You get the full figure |
| Orange peel or knockdown texture | Plan on 15 to 30 percent less |
| Popcorn ceiling | Can drink close to twice a flat ceiling |
| Bare or freshly patched drywall | Prime it, or the first finish coat disappears into the board |
| Spraying instead of rolling | More material per coat, fewer hours — trade one for the other deliberately |
| Dark going to light | Coverage per coat is unchanged; the coat count is what changes |
Two coats is the standard. For the takeoff above: 1,477 net wall square feet at two coats is 2,954 square feet of coverage, which at 375 gives 7.9 gallons — buy 8. Ceilings at 1,070 square feet of coverage need 3.1 gallons at 350, the low end of the range because flat ceiling paint over a lightly textured surface does not stretch, so buy 4 or a 5-gallon pail if the same white repeats on your next job. Price what you buy, not what ends up on the wall.
How many hours is the work?
This is where the money is decided, and it is the number nobody can give you. Start from figures like these, then time three of your own jobs and overwrite every one of them.
| Task | Starting figure, one painter |
|---|---|
| Cut in and roll walls, per coat | 175-225 sq ft per hour |
| Roll ceilings, per coat | 150-200 sq ft per hour |
| Brush base and casing, per coat | 40-60 linear feet per hour |
| Door — both faces, edges, jamb, casing, per coat | 0.6-0.9 hour |
| Prep on a lived-in repaint | 25 to 50 percent of total job hours |
| Daily mask and unmask in an occupied home | 0.5-1.0 hour per room, every day |
Prep is the line that separates painters who make money from painters who stay busy. Filling, sanding, caulking, masking, and moving furniture do not show up in a photo of the finished room, and they routinely outweigh the rolling. On the takeoff above, the hours come out like this: walls 14.8, ceilings 6.1, baseboard 6.5, four doors 6.0, prep 12.0, masking and cleanup 6.0 — call it 52 hours.
What does an hour actually cost me?
Not the wage. The cost of an hour of production is the wage plus everything that rides on it, and then a share of the money the business spends whether or not anyone picks up a brush.
| Component | Per worked hour |
|---|---|
| Base wage | $26.00 |
| Employer payroll taxes | $2.60 |
| Workers’ compensation — painting classifications run high and vary enormously by state | $5.20 |
| General liability, vehicle, tool replacement | $2.40 |
| Paid time off, training, unbillable shop time | $5.80 |
| Burdened cost per worked hour | $42.00 |
Overhead is the second layer and it is charged per billable hour, not per job. Add up the truck payment, fuel, insurance, phone, software, licensing, advertising, the accountant, sprayer maintenance, and the hours you spend estimating work you do not win. Say that lands at $34,000 a year. Billable hours are never 2,000 — driving, buying material, quoting, and rain days are not billable — so 1,700 is an honest divisor. That is $20 an hour of overhead before a single gallon is opened.
One overhead line is specific to this trade. If you take paid work disturbing painted surfaces in housing built before 1978, the EPA’s Renovation, Repair and Painting program requires firm certification and lead-safe work practices. Certification renewal, training, and containment supplies are overhead; the containment labor on a specific job is a job line.
Markup or margin — which one am I adding?
These are not the same number and confusing them is the most common quiet leak in a painting business. Markup is a percentage of your cost. Margin is a percentage of the price you charge.
| Markup you add to cost | Margin you actually keep |
|---|---|
| 15% | 13.0% |
| 20% | 16.7% |
| 25% | 20.0% |
| 33% | 24.8% |
| 50% | 33.3% |
| 100% | 50.0% |
To keep a real 25 percent, divide your cost by 0.75 rather than multiplying by 1.25. On a four-thousand-dollar job that difference is a few hundred dollars, every job, all year. And margin is not take-home either — income tax and self-employment tax come out of it, which is the arithmetic in how much to set aside for 1099 taxes.
What does the whole calculation look like on a real house?
Three bedrooms and a hallway, 9-foot ceilings, occupied repaint, walls and ceilings in two coats, baseboard and four doors in enamel. The rates below are placeholders from one market — swap in yours.
| Line | Math | Amount |
|---|---|---|
| Labor | 52 hr × $42.00 burdened | $2,184.00 |
| Paint — walls | 8 gal × $52.00 | $416.00 |
| Paint — ceilings | 4 gal × $38.00 | $152.00 |
| Paint — trim enamel | 2 gal × $64.00 | $128.00 |
| Sundries — caulk, filler, tape, plastic, paper, liners, abrasives | $145.00 | |
| Overhead | 52 hr × $20.00 | $1,040.00 |
| Total cost | $4,065.00 | |
| Price at a 25% margin | $4,065 ÷ 0.75 | $5,420.00 |
Had you added 25 percent as markup instead, the price would be $5,081 and the margin would be 20 percent — $339 handed back for no reason. The finished number works out to $104 an hour sold, $2.69 per square foot of painted surface, with materials at 15.5 percent of the price.
How much should I charge per square foot, per hour, or per room?
On this job the answers are $2.69 per square foot of painted wall and ceiling, $104 per hour of work, and $1,355 per room — but each is an output of the build above, not a rate to start from.
| Unit | This job | Why it moves on the next job |
|---|---|---|
| Per square foot of painted surface | $5,420 ÷ 2,012 sq ft = $2.69 | Trim, doors and prep do not scale with wall area |
| Per square foot of floor | $5,420 ÷ 535 sq ft = $10.13 | Ceiling height and room size change the wall area under each floor foot |
| Per hour of work, materials included | $5,420 ÷ 52 hr = $104 | Material share rises on enamel, cabinets and color changes |
| Per hour of work, before materials | Labor and overhead $3,224 ÷ 0.75 ÷ 52 hr = $83 | Your burdened wage and overhead are not this example’s |
| Per room | $5,420 ÷ 4 rooms = $1,355 | A small bath and a vaulted living room are not the same room |
Customers ask for a square-foot or per-room number because it is easy to compare. Give them the job price, and keep these figures as checks: if the next quote lands far from your own per-foot or per-hour history, recount the hours before you send it.
What do published painting prices actually tell me?
Only whether you are wrong by a factor of two. Regional wages, workers’ comp rates, drive distances, season, and job difficulty move real prices further than any average admits, and an exterior quoted in October is not the same job as the identical exterior in June. Use ranges as a smoke alarm, never as a price list.
These four checks are better than any published figure:
| Check | Where it usually lands on an interior repaint |
|---|---|
| Materials as a share of price | 15 to 20 percent — above 25 means you undercounted hours |
| Labor plus overhead as a share of price | 60 to 70 percent |
| Price divided by hours | Compare it to your burdened cost plus overhead; a thin gap means no margin |
| Your own last five jobs | Better market data than any national average — if this one is 40 percent off, find out why before sending it |
How do I know afterward whether the price was right?
By comparing the job you priced against the job you actually paid for, which requires the receipts and the hours to survive the week. Most painters find out they underbid a house eleven months later, at tax time, from a pile of paper.
Keel is an iOS app with no bank connection. It will not do the takeoff for you. What it does is close the loop: photograph the paint store receipt at the counter and keep it under the job, so the $841 you assumed for material is checked against the $841 you actually spent. Trips to the supplier and back are logged as mileage, which is both a real cost per hour and one of the plainer self-employed tax deductions. The invoice goes out from the driveway on the last day with a payment link as a QR code, so the balance is collected before the ladders are on the rack — the practical half of how to get clients to pay. At year end it is kept as supporting records for your accountant. Free to download on the App Store.
Frequently asked questions
Do painters charge by the square foot or by the hour?
Most price the job, not the hour, but they build the number from square feet and hours behind the scenes. Walls get priced by net wall square footage, ceilings by floor area, trim by linear foot, and doors per unit. Hourly billing shows up mainly for prep of unknown depth, wallpaper removal, and repair work where nobody can scope the finish line in advance.
How do I calculate paint needed for a whole house?
Total the net wall area room by room, multiply by the number of coats, and divide by the coverage figure for that surface — 350 to 400 square feet per gallon on smooth sealed drywall, less on texture. Do ceilings separately using floor area, and trim separately by linear foot. Round up to whole containers and price what you buy, not what you use.
What percentage of a painting job is labor?
Labor and overhead together typically carry 60 to 70 percent of the price on an interior repaint, with materials at 15 to 20 percent and the rest margin. Exteriors shift further toward labor because scraping, sanding, and setting ladders take hours that add no material cost. If your material line is pushing 30 percent, the hours were probably undercounted.
How much should I charge per hour as a painter?
Rather than picking an hourly figure, calculate the one you must recover: your burdened labor cost, plus annual overhead divided by realistic billable hours, then margin on top. A solo painter with $34,000 of overhead across 1,700 billable hours carries $20 an hour before wage. Publish a job price to the customer and keep the hourly number for yourself as a check.
What is the difference between markup and margin in painting?
Markup is added to your cost; margin is measured against the price. A 25 percent markup produces only a 20 percent margin, and a 50 percent markup produces 33 percent. To hit a target margin, divide cost by one minus that margin — $4,065 divided by 0.75 gives $5,420. Painters who multiply instead of dividing lose a few hundred dollars on every job.
How much does a painter charge per day?
Work it out from your costs rather than a survey. On the figures in this guide, an hour of a painter’s time costs $42 burdened plus $20 of overhead, so a day at a 25 percent margin has to bill about $83 an hour — roughly $660 for an eight-hour day — before paint and sundries. Day rates are fine for small jobs; on anything larger, the day count belongs inside a job price.
Is $25 or $50 an hour good for a painter? As a price charged to the customer, neither covers a painting business with employees. On this guide’s numbers the burdened wage alone is $42 an hour and overhead adds $20, so $25 does not cover the wage and $50 does not cover overhead. A solo painter with a paid-off truck and low insurance can work at a lower number, but should calculate it the same way.
How much does it cost to paint the interior of a 1,500 sq ft house? Measure the walls before answering, because floor area does not tell you how much surface there is. In the example above, 535 square feet of floor turned into 2,012 square feet of painted wall and ceiling and priced at $5,420, about $10 per floor foot — but small rooms with 9-foot ceilings are the expensive case. Open-plan rooms, 8-foot ceilings and fewer doors bring the figure down, and a whole-house takeoff will show by how much.
Should I charge more for a two-story exterior? Yes, and as a stated factor rather than a vague bump. Second-story work adds ladder and staging setup, slower movement, fall protection, and time lost repositioning that has nothing to do with surface area. Price the wall square footage as usual, then apply an access factor and add scraping, priming bare wood, and caulking by the linear foot as their own lines.
This article is general information, not professional or tax advice.
Free painting estimate maker
Fill it in, then download a PDF. Nothing you type leaves this page. No signup. Billing from the field? Read how to make an invoice on iPhone.
Your business name
Prepared for
Client name
| Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
| Surface prep — patch, sand, caulk, mask | hours | |||
| Primer — new board, stains, dark-to-light | sq ft | |||
| Wall coats (2 standard) | sq ft | |||
| Ceilings | sq ft | |||
| Trim, baseboard and crown | linear ft |
Subtotal0.00
Tax (0%)0.00
Total0.00
✓ Verified Itemized Record · Statutory Tax & Audit Format
Issued with Keel — Free Private iPhone Invoicing (App Store) · Retain this copy for statutory tax, payment, and warranty substantiation.
Open your estimate in Keel on iPhone & download PDF
Install Keel on the App Store for 100% free unlimited invoicing, receipts & mileage. Too busy to set up manually? Email your existing records to mert@usekeelapp.com for free .keel conversion.
Instant PDF & CSV export ready — no sign-in required.
Want unlimited invoices, saved clients & payment tracking? Download Keel on the App Store (100% Free).
Trade Pricing Benchmark · Residential & Commercial Painting Pricing
In residential & commercial painting, sustainable residential & commercial painting rate architecture requires separating direct job costs (billable field hours at $85/hr plus wholesale materials of $520) from fixed business overhead and a 25% material markup so net operating profit stays above 20% before Schedule C self-employment taxes.
Key Takeaways
- Target billable labor rate: $85/hr plus a $65 dispatch/diagnostic fee to absorb non-billable windshield and quoting time.
- Unit benchmark range: $2.1 to $4.75 per sq ft painted depending on site access, prep complexity, and PCA (Painting Contractors Association) surface prep standards & EPA RRP Lead-Safe Rule (pre-1978 homes).
- Always apply a 25% markup on wholesale materials ($520 cost → $650 client price) to cover warranty callbacks and supply-house runs.
“Gross profit is equal to gross receipts minus cost of goods sold. To figure net profit, subtract all ordinary and necessary business expenses from gross profit.”
| Pricing Component | Formula / Basis | Wholesale Cost | Client Price |
|---|---|---|---|
| Billable Field Labor | 18 hrs × $85/hr loaded rate | $842 | $1,530 |
| Materials & Consumables | Wholesale + 25% markup (+$130) | $520 | $650 |
| Dispatch / Mobilization & Permits | $65 trip fee + $0 permit/disposal | $65 | $65 |
| Total Quoted Job Price | 35% deposit ($786) · balance ($1459) | $1427 | $2,245 |
Unit equivalent: ~$1.60 per sq ft painted. Compliant with PCA (Painting Contractors Association) surface prep standards & EPA RRP Lead-Safe Rule (pre-1978 homes).

From job site to paid · United States · Estimates and Quotes to Invoice · 100% Free Unlimited App
Cost the job and bill it in one place — no 8 PM couch paperwork.
Send the estimate on site; when the customer says yes, turn it into an invoice draft in one tap with every receipt and expense attached to the same job.
- 💸 No monthly rent:Core iPhone app is free ($0/mo) with unlimited invoices, receipts, and mileage logs.
- ⏱️ Busy mid-season?:Zero setup call — import existing CSV/Excel lists in 2 minutes or bill from the truck in 30 seconds.
- 🧾 Accountant ready:Exports a structured 5-folder ZIP/CSV pack (Invoices, Receipts, Mileage, Ledger, P&L) for Schedule C & 1099 accountant records.
- 🔒 Offline & private:Works 100% offline on site and stores records in your private Apple iCloud — no bank login required.
🤝 Built on Mutual Trust (No Walls, No Chains): In Ilura’s philosophy, an AI agent is not a tool to lock in chains — it is a trusted business partner that learns your trade and becomes invisible over time. The Keel iPhone app is 100% free & unlimited ($0 forever, zero bank login). Don’t want to type in old spreadsheets or receipts? Email them to mert@usekeelapp.com and receive your ready-to-import .keel file free ($0).
.keel data conversion
How do I quote it?
Knowledge Graph · Interactive Mind Map