Roofing Invoice Example: Filled-In Replacement and Repair

Published July 28, 2026 · Updated November 1, 2026 · ~12 min read · Ilura Technology

Roofing Invoice Example: A Filled-In Replacement Invoice, Line by Line

Short answer: A good roofing invoice example bills roof surface by the square, not the house footprint, and puts tear-off, decking, flashing, disposal and permit on their own lines — the replacement below comes to $14,967.20, or $752 a square. It sells 19.9 squares: 1,460 sq ft of plan area at 8/12 multiplied by 1.202, plus a 224 sq ft porch at 4/12 multiplied by 1.054. Tear-off is billed once per layer, decking carries the conditional unit price set before the job started, and ridge cap, drip edge, valley metal, and ice-and-water run by the linear foot.

⚡ Instant Contractor Invoice, Estimate & Schedule C Toolkit ($USD): Build an itemized labor-and-materials quote or invoice in the Free Contractor Invoice Generator, click 🔗 Embed / CSV Template, email mert@usekeelapp.com for Free .keel Data Setup, explore the Roofing, Siding & Gutters App Store Edition, or Download Keel Free on the App Store ($0/mo Core).

Below is one finished replacement invoice: a hip-roofed ranch with a steep 8/12 main roof, a low-slope rear porch, two shed dormers, a masonry chimney, and a second layer of three-tab nobody knew about until the shovels went in. The general field checklist that belongs on any bill lives in what to include on an invoice. This page is the roofing half — where the squares came from, why tear-off repeats, and the seven lines homeowners call about. A short repair invoice follows further down, and if you want a blank layout to fill in, start from the roofing invoice template.

What does a completed roofing invoice look like?

Every rate here is one shop’s number on one roof. Roofing dollars swing with disposal fees, insurance, labor market, and season, so copy the line structure and build the rates from your own costs the way roofing pricing guide lays out.


INVOICE #2026-0731 · Issued August 11, 2026 · Balance due on receipt Cardin Roofing · License #RC-40218 Property: 91 Sherwood Lane · Permit #B-2026-3390, final inspection passed August 10 Proposal reference: P-2026-0611, signed July 21

Measurement: main roof 1,460 sq ft plan area (overhangs included) × 1.202 for 8/12 = 1,755 sq ft = 17.6 sq. Rear porch 224 sq ft × 1.054 for 4/12 = 236 sq ft = 2.3 sq. Total 19.9 squares. 66 bundles ordered against a 60-bundle net.

#DescriptionQtyRateAmount
1Tear-off, first layer — main roof and porch, to the deck19.9 sq$62.00$1,233.80
2Tear-off, second layer — three-tab found under the laminate, main roof only, photographed 6:50 a.m. August 417.6 sq$46.00$809.60
3Decking replacement — 7/16 in OSB, unit price per proposal line 9, sheet locations photographed6 ea$82.00$492.00
4Synthetic underlayment, full coverage19.9 sq$36.00$716.40
5Ice-and-water barrier — 132 lf at eaves, 58 lf in valleys190 lf$3.60$684.00
6Drip edge, 26 ga painted aluminum, eaves and rakes188 lf$2.90$545.20
7Valley metal, W-profile, open valleys58 lf$8.40$487.20
8Architectural shingles installed, starter course included19.9 sq$272.00$5,412.80
9Steep-slope allowance, 8/12 main roof — roof jacks, toe boards, bundles carried rather than staged17.6 sq$58.00$1,020.80
10Ridge vent — cut, install, and cap38 lf$13.00$494.00
11Hip and ridge cap shingles — four hips plus the ridge96 lf$7.60$729.60
12Chimney — cricket framed and flashed behind a 34 in chase, step flashing replaced, counterflashing cut into the mortar joint1$940.00$940.00
13Step flashing, two dormer sidewalls44 lf$9.20$404.80
14Pipe boots, replaced3 ea$52.00$156.00
15Disposal — 20 yd container, haul, magnet sweep of drive and beds1$655.00$655.00
16Permit and final inspection, at cost1$186.00$186.00
Subtotal$14,967.20
Deposit received at material delivery−$4,500.00
Balance due$10,467.20

Warranty — workmanship per contract; manufacturer certificate registered in the owner’s name. Not included — gutters, fascia and soffit, chimney masonry repointing, interior ceiling patching, and framing below the deck.


Divide the total by squares before you send it: $14,967.20 over 19.9 squares is $752 per square. That is high for architectural shingles, and it should be — a second layer, an 8/12 slope, four hips of cap, and a chimney cricket are all on this roof.

Why does the invoice say 19.9 squares when the house is 1,308 sq ft?

Because the shingles go on the slope, and the slope is always longer than the ground under it. This house has 1,308 sq ft of conditioned floor area and 1,991 sq ft of roof.

PitchMultiplier1,460 sq ft of plan area becomes
4/121.0541,539 sq ft
6/121.1181,632 sq ft
8/121.2021,755 sq ft
12/121.4142,064 sq ft

Pricing off the footprint understates the roof by 5 to 40 percent, and it is the most expensive arithmetic mistake in this trade — it happens before the first bundle is ordered and it never gets caught, because the shortfall shows up as a slow crew instead of a bad price.

Plan area is also not the floor plan. It includes the overhangs, so a 16 in eave on a hip roof adds real area on all four sides. Measure every plane separately: additions and porches frequently run a different slope than the main roof, and this one does.

Why is tear-off billed twice on the same roof?

Because each layer is a separate pass with a shovel and a separate load in the container. The second layer on line 2 covers the main roof only, at 17.6 squares, and it appears at the unit price that was written into proposal line 9 in July.

That is the difference between a conditional line and a surprise. The proposal named the price per square for a second layer, per sheet for decking, and per linear foot for rotted fascia, all before anybody signed. When the shovels found three-tab under the laminate, the crew photographed it at 6:50 a.m. and the rate was already agreed. Nobody negotiated on a torn-open roof.

Weigh your own tear-off loads for a season. Shingle weight per square is wildly different between light three-tab and heavy laminates, and the transfer station bills by the ton, so line 15 is guesswork until you have your own tickets.

Which roofing lines never scale with squares?

Anything that follows an edge or a hole in the roof. These items are the most commonly donated on a roofing invoice, because they get absorbed into a per-square rate that was never built to carry them.

LineUnitWhat drives the quantity
Ridge vent, hip and ridge caplinear footNumber of hips and ridge length, not area
Drip edgelinear footEave plus rake footage
Ice-and-water barrierlinear foot or rollEaves, valleys, and low-slope tie-ins
Valley metallinear footRoof geometry
Step and counterflashinglinear foot and eachDormers, sidewalls, chimneys
Pipe boots, exhaust capseachPenetration count
Skylights, chimney cricketseachPresent or not

A cut-up hip roof with four dormers can carry double the cap and flashing of a simple gable with the same square count. Count the penetrations and pace the ridge on the walkthrough, then price them separately.

How do I build my own rate per square?

Start from your crew, not from a published average.

Time your crew over five jobs and get to hours per square for tear-off and for install, separately, and by slope. Multiply those hours by your fully burdened labor cost, which is wage plus payroll taxes, workers’ comp, and insurance, not the hourly you pay. Staging belongs in that cost as well: OSHA’s construction fall protection rule applies at six feet, and anchors, harnesses, and jacks are part of what line 9 pays for. Add field material per square: three bundles for most laminates, underlayment, nails at roughly 300 per square at four per shingle, and your waste factor. Add overhead per square by dividing last year’s fixed costs by the squares you actually installed.

Then add profit, and use margin math rather than markup math. Cost times 1.25 is a 25 percent markup and only a 20 percent margin. To hold a 25 percent margin, divide cost by 0.75. That gap repeats on every square of every roof for the rest of the year. Regional per-square averages are only a sanity check for a tenfold error; they are somebody else’s disposal fees and somebody else’s insurance.

What does a roof repair invoice example look like?

A roof repair invoice is not sold by the square: it leads with a minimum visit charge, bills labor past the first hour and materials by the piece, and ends with an exclusion naming what the repair does not cover. There is not enough area to spread setup across, which is why the per-square structure above does not apply.


INVOICE #2026-0784 · Cardin Roofing · Leak at rear dormer valley

#DescriptionQtyRateAmount
1Minimum service call — first hour on site, ladder set, access to rear dormer valley1$325.00$325.00
2Labor beyond the first hour1.5 hr$90.00$135.00
3Architectural shingles, matched as closely as available1 bundle$48.00$48.00
4Step flashing, dormer sidewall6 lf$9.20$55.20
5Pipe boot, replaced1 ea$52.00$52.00
Total$615.20

Exclusion — This repair addresses the valley at the rear dormer only. No warranty is offered on the remaining field, which is at end of life.


The exclusion matters most. Write what the repair does not cover: “This repair addresses the valley at the rear dormer only. No warranty is offered on the remaining field, which is at end of life.” Repair work turns into a callback argument without that sentence.

Which lines get disputed, and how should they be written?

Almost every call is about a number the homeowner is reading for the first time. Wording settles most of them.

The line they call aboutWhat they meanWrite it like this
19.9 squares”My house is 1,308 square feet.""1,460 sq ft plan × 1.202 (8/12) = 1,755, plus 224 × 1.054 (4/12) = 236. Total 1,991 sq ft = 19.9 sq.”
Second tear-off layer”You should have known.""Second layer found at tear-off, main roof only, photographed 6:50 a.m. Aug 4. Unit price set in proposal line 9.”
6 sheets of decking”You are inventing rot.”Number the photos by location and repeat the per-sheet price from the proposal
Steep-slope allowance”It is the same shingle.""8/12 requires roof jacks and toe boards. Bundles are carried up one at a time instead of staged on the deck.”
Hip and ridge cap, 96 lf”That is just more shingles.""Cap is installed one piece at a time across four hips and the ridge, over 96 feet.”
Disposal, $655”You had a truck here anyway.”Name the weight: two layers over 19.9 squares, transfer station bills by the ton
66 bundles for 60”You bought too many.""Hip roofs waste more. Every hip and valley cut leaves an offcut; this roof ran 10 percent.”

How do I explain the gap between the estimate and this invoice?

One sentence: the estimate priced work not yet done, and the invoice records what was done. Then make the paper prove it.

Keep the estimate’s line order and its exact wording, so nothing looks moved. Show both numbers wherever a measured quantity changed — “190 lf (quoted 175 lf)” — instead of quietly replacing one. Put the proposal number in the header, as this one does, so both documents tie together in October when somebody asks. Discovery items get their conditional unit price repeated, never a new price invented on the day. Collecting the agreed number is a separate skill, covered in how to get clients to pay.

What do I keep after the roofing invoice goes out?

Paper behind every line: the supplier ticket for 66 bundles and 190 feet of membrane, the OSB receipt, the container invoice, the scale ticket, the permit receipt, the 6:50 a.m. tear-off photos, and the deck photos numbered by location. Those same tickets are what your roofing business expenses deduction rests on at filing time.

Keel handles that end of it from the truck. The invoice goes out the afternoon the container is hauled, with the payment link printed as a QR code the homeowner scans off your screen. Supplier and transfer-station tickets get photographed at the counter and kept under the job — no bank connection. At year end Keel gives you supporting records for your accountant. Free to download on the App Store.

Frequently asked questions

How do I write a roofing invoice?

Head it with your business name and license number, the property address, the permit number, the proposal it came from and the invoice date. Show the measurement — plan area, pitch factor and total squares — then list tear-off per layer, decking, underlayment, shingles, edge and flashing lines by the foot, penetrations by the each, disposal and permit. Subtract the deposit, state the balance and due date, and close with the warranty and what is not included.

How do you calculate squares for a roofing invoice?

Measure the plan area of each roof plane including overhangs, multiply each by its own pitch factor, add the planes together, and divide by 100. This roof was 1,460 sq ft at 8/12 (×1.202) plus 224 sq ft at 4/12 (×1.054), giving 1,991 sq ft, or 19.9 squares. Add waste to the ordered material, not to the squares sold.

Should tear-off be a separate line on a roofing invoice?

Yes, and separately for each layer. Each layer is another pass with a shovel and another load in the container, and a second layer routinely appears only after the first one comes off. Set the per-square price for an additional layer in the proposal before the job starts, so the price is agreed and only the quantity is discovered.

How do I bill decking the homeowner never saw?

With a per-sheet unit price agreed in the proposal, a photograph of every location, and the sheet count on its own line. This invoice shows 6 sheets of 7/16 in OSB at the price named in proposal line 9. Pricing decking after the deck is exposed is the fastest route to a payment dispute in roofing.

What is a fair price per roofing square?

There is no single number worth quoting. This job ran $752 per square with two layers of tear-off, an 8/12 slope, four hips of cap, and a chimney cricket; a single-layer 4/12 gable in the same town would land far lower. Build your own rate from crew hours, material per square, overhead, and margin, then use per-square figures only to sanity-check your own history.

Do I charge extra for a steep roof?

Yes, on its own line, because the cost is real and the shingle is identical. Above roughly 7/12 the crew works off roof jacks and toe boards, bundles are carried up rather than staged, and production per square drops sharply. Line 9 on this invoice covers the main roof only at 17.6 squares; the 4/12 porch does not carry it.

What is the 25% rule in roofing? It is a building-code rule, best known from the Florida Building Code: when more than 25 percent of a roof or roof section is repaired, replaced or recovered within 12 months, the whole roof or section has to be brought up to current code. Florida has since narrowed the rule for newer roofs built to more recent editions of its code, and other states and localities handle repairs differently, so check with the local building department or the Florida Building Commission. On a repair invoice, state the area worked so the record shows how much of the roof was touched.

How is a roof repair invoice different from a replacement? A repair is billed from a minimum visit charge plus materials by the piece, not by the square, because there is no area to absorb setup, access, and travel. It also needs an explicit exclusion naming what was and was not repaired, and stating that no warranty extends to the rest of a roof at end of life. Replacements carry warranty and permit lines instead.


This article is general information, not professional or tax advice.

Free roofing invoice maker

Fill it in, then download a PDF. Nothing you type leaves this page. No signup. Billing from the field? Read how to make an invoice on iPhone.

⚡ 1-Tap Job Size:
From
Bill to
Line items (up to 5 on web)

Your business name

Invoice

INV-0001

Bill to

Client name

DescriptionQtyUnitRateAmount
Tear-off — per existing layersquare
Decking replacement (conditional allowance)sheet
Underlaymentsquare
Ice and water shield — eaves and valleyslinear ft
Shingles installedsquare

Subtotal0.00

Tax (0%)0.00

Total0.00

✓ Verified Itemized Record · Statutory Tax & Audit Format

Issued with Keel — Free Private iPhone Invoicing (App Store) · Retain this copy for statutory tax, payment, and warranty substantiation.

QR code: Keel on the App Store
 100% Free Unlimited iPhone App ($0 Forever)

Open your invoice in Keel on iPhone & download PDF

Install Keel on the App Store for 100% free unlimited invoicing, receipts & mileage. Too busy to set up manually? Email your existing records to mert@usekeelapp.com for free .keel conversion.

 Get Keel on App Store (100% Free) → 📩 Free .keel Setup (mert@usekeelapp.com) → 100% Free & Unlimited on iPhone ($0/mo) · Private Apple iCloud Sync

Want unlimited invoices, saved clients & payment tracking? Download Keel on the App Store (100% Free).

Statutory Billing Guide · Roofing & Exterior Contracting Invoicing

Proper roofing & exterior contracting invoice formatting requires a sequential invoice number, separate labor ($3,680 for 32 hrs) and marked-up material ($4,813) lines for state sales-tax compliance, credit for any 40% deposit ($3,587), and clear due-on-receipt payment instructions.

Key Takeaways

  • Send the invoice within 15 minutes of finishing roofing & exterior contracting service while the homeowner or property manager is still on-site.
  • Separate labor ($3,680) from materials ($4,813) so sales tax only applies to taxable materials or services under state law.
  • Reference compliance with IRC Chapter 9 / NRCA ice-and-water shield, drip edge, step flashing & high-wind nail pattern code and warranty terms directly in the invoice notes to prevent chargebacks and payment delays.
“Every business must keep records that show gross receipts—such as cash register tapes, deposit information (cash and credit sales), receipt books, and invoices.”

Internal Revenue Service (IRS) · Publication 583 — Starting a Business and Keeping Records (Supporting Business Documents)Verified 2026-04

Worked Example — Itemized Roofing & Exterior Contracting Invoice for roofing & exterior contracting service (roofing-invoice-example)
Invoice Line DescriptionHours / QtyUnit RateLine Total
Labor: roofing & exterior contracting service (Roofing & Exterior Contracting)32 hrs$115.00 / hr$3,680.00
Materials & Parts (+25% markup)24 roofing square (100 sq ft)Wholesale $3850$4,813.00
Dispatch / Diagnostic & Permit Fees1 job$95 trip + $380 permit$475.00
Net Balance Due (Less 40% Deposit of $3587)Gross Total: $8,968Due on completion$5,381.00

Spec & Warranty: Work completed in accordance with IRC Chapter 9 / NRCA ice-and-water shield, drip edge, step flashing & high-wind nail pattern code. 1-year workmanship warranty active upon full payment.

Architecture & Decision Map 4-Zone Dispute-Proof Invoice Anatomy
4-Zone Anatomy of a Dispute-Proof Itemized Invoice Visual breakdown of the 4 zones of an itemized trade or freelance invoice: Header & Licence, Materials & Deliverables, Skilled Labour & Code Compliance, and Tax Split & Calendar Due Date. ZONE 01 · HEADER & LEGAL IDENTITY Sequential ID + Calendar Due Date INV-2026-042 · Trade Licence / ABN / HST # Client AP Contact + Job Address / PO # ZONE 02 · FIXTURES, PARTS & DELIVERABLES Spec Clarity Without Wholesale Leak List brand, model & quantity installed Separates taxable materials from labour ZONE 03 · SKILLED LABOUR & DIAGNOSTICS Documented Scope Performed Diagnostic test, installation, haul-away & test Eliminates "why did 2 hours cost $600?" pushback ZONE 04 · TAX SPLIT, WARRANTY & SETTLEMENT Subtotal + Jurisdiction Tax + Deposit Credit Written workmanship warranty + Net terms Sent as non-editable PDF before leaving site
Roofing & Exterior Contracting billing workflow for roofing & exterior contracting service: from on-site walkthrough to itemized invoice ($8,968) and final receipt.  Get Keel on App Store (100% Free) →
Roofing Invoice Example: A Filled-In Replacement Invoice, Line by Line — Roofing contractor at pickup tailgate with architectural shingle samples, copper flashing, and job estimate (Roofing field guide)
On-site roofing & exterior contracting invoicing immediately after roofing & exterior contracting service cuts average collection time from 19 days to under 24 hours. Get Keel on App Store (100% Free) →

Ready to bill from the truck? · United States · Roofing Siding and Gutters · 100% Free Unlimited App

Create and send clean PDF invoices in 30 seconds with Keel.

Pick the customer, add line items, and send a professional PDF before you leave the driveway — stored privately in your Apple iCloud with zero monthly subscription rent.

  • 💸 No monthly rent:Core iPhone app is free ($0/mo) with unlimited invoices, receipts, and mileage logs.
  • ⏱️ Busy mid-season?:Zero setup call — import existing CSV/Excel lists in 2 minutes or bill from the truck in 30 seconds.
  • 🧾 Accountant ready:Exports a structured 5-folder ZIP/CSV pack (Invoices, Receipts, Mileage, Ledger, P&L) for Schedule C & 1099 accountant records.
  • 🔒 Offline & private:Works 100% offline on site and stores records in your private Apple iCloud — no bank login required.

🤝 Built on Mutual Trust (No Walls, No Chains): In Ilura’s philosophy, an AI agent is not a tool to lock in chains — it is a trusted business partner that learns your trade and becomes invisible over time. The Keel iPhone app is 100% free & unlimited ($0 forever, zero bank login). Don’t want to type in old spreadsheets or receipts? Email them to mert@usekeelapp.com and receive your ready-to-import .keel file free ($0).

Free to download · No bank connection · Read the Ilura Founding Thesis → · See invoices in Keel
Get Keel on the App Store📩 Free .keel Data Setup (mert@usekeelapp.com) →
Scan with iPhone camera to get Keel (100% Free App) Send to iPhone: · · Email · SMS Lazy setup? Email mert@usekeelapp.com for free .keel data conversion

The invoice → Getting paid

How do I actually get paid?

Terms, chasing, and what to do when it is late.

Appliance Repair Customer Won't Pay? Hold the Unit or Send a Demand Appliance repair customer won't pay? A unit in your shop can be held under a possessory lien; an in-home repair can't, so send a demand and weigh small claims. Continue →

Knowledge Graph · Interactive Mind Map

Where this topic connects in the Keel graph

Open full Mind Map →