- Contractors & trades
- ✓ Verified Jul 29, 2026
- ↓ Jump to free invoice maker
How to Invoice After Patio Concrete, Line by Line
Short answer: How to invoice after patio concrete starts with the batch ticket, not your takeoff. A 14 ft by 20 ft slab is 280 sq ft, and at 4 inches that is 280 ÷ 81 = 3.46 cu yd, ordered at 3.75 or 4. Then bill the lines a backyard creates on its own: placement method, base and compaction, forms by the linear foot, joints, finish, and sealer. Collect at the tailgate.
⚡ Instant Concrete Masonry and Hauling Toolkit (
🔗 Embed / CSV Template+100% Free Unlimited App): Open the Free Invoice, Quote & Estimate Maker (or click🔗 Embed / CSV Template), email mert@usekeelapp.com for Free.keelData Setup, explore the Concrete Masonry and Hauling App Store Edition, or Download Keel Free on the App Store ($0/moCore Plan) to manage estimates, invoices, job-site receipts, and mileage offline on iPhone.
A patio is the smallest concrete job that behaves like a big one. The yardage is trivial and the money is nowhere near the yardage — it is in getting three and a half yards through a thirty-six inch gate, in the pitch away from the house, and in a finish the customer will be looking at from a kitchen window every morning for twenty years. The general shape of the document is covered in what to include on an invoice. Below is what the paper looks like when the pour was a backyard slab.
What actually goes on a patio concrete invoice?
Twelve lines, and each one exists because it was a separate decision, a separate vendor, or a separate hour.
| Line | Unit on the invoice | Why it stands alone |
|---|---|---|
| Demo and haul of the old patio | Sq ft removed, plus disposal by the ton or load | The scale ticket sets it, not you |
| Excavation and grading | Cu yd moved and hauled | Spoil takes more room loose than it did in the ground |
| Base stone and compaction | Tons delivered, passes compacted | The quarry bills weight; you spread volume |
| Placement method | Buggy, wheelbarrow, pump, or conveyor, by hour or trip | The single largest patio-specific cost |
| Ready-mix | Cubic yards, psi, admixtures, from the batch ticket | Third-party paper with the plant’s name on it |
| Short-load charge | Flat, per the plant’s threshold | A 3.5 yd order rarely prices like 3.5 yards |
| Forms and stakes | Linear feet of perimeter | Perimeter, not area, drives forming hours |
| Reinforcement | Sq ft of mesh or linear feet of rebar, with chairs | Steel and the labor to keep it off the dirt |
| Finish | Sq ft, named — broom, trowel, exposed, stamped | Different operations, different crew sizes |
| Joints | Linear feet cut, plus the isolation joint at the house | A return trip on the concrete’s schedule |
| Sealer | Sq ft, on a separate visit | Another day, another product, a maintenance sale |
| Site restoration | Flat or hourly | Sod, ruts, a fence panel put back |
Name the patio on the invoice the way the customer names it — “rear patio off kitchen slider, 14 × 20” — because in two years they will call about the side walk and neither of you will remember which slab this was.
Where do the cubic yards on the invoice come from?
The batch ticket. Your takeoff is what you ordered; the ticket is what was delivered, and the ticket is what the customer sees.
The takeoff arithmetic is one line: area in square feet times thickness in feet, divided by 27. At 4 inches that is square feet divided by 81. A 14 by 20 patio is 280 sq ft, so 280 ÷ 81 = 3.46 cu yd. At 5 inches, because a hot tub or a heavy outdoor kitchen is going on part of it, divide by 64.8 instead and the same footprint becomes 4.32.
Then read what actually happened. The ticket carries the yards, the mix design, the specified strength in psi, the admixtures, and any water added on site. Print those on the invoice. A customer looking at “3.75 cu yd, 4000 psi, fiber, air entrained” next to a plant’s ticket has nothing to argue with, and a customer looking at “concrete: $X” has an evening to fill.
One patio-specific line belongs next to the yardage. Plants set a minimum load and a surcharge below it, and almost every residential patio lands under that threshold. That charge is real, it is on the plant’s rate sheet, and it should be on your estimate and your invoice as its own item rather than buried in a per-square-foot number that was built on driveways. Ask your plant where their threshold sits before you quote the next small slab.
Why does placement get its own line on a backyard job?
Because the truck cannot reach the pour, and everything that follows from that is labor nobody sees in a square-foot price.
A driveway is poured off the chute. A patio behind a house is poured through whatever opening exists. Measure the gate before you quote, because a powered buggy will not fit through a standard thirty-six inch gate and a wheelbarrow relay is the fallback.
| Method | What it needs | What it does to the day |
|---|---|---|
| Direct chute | Truck within reach of the forms | Fastest, and rare on a patio |
| Wheelbarrow relay | Plank runway, plywood over lawn, bodies | Roughly 9 loads per cubic yard at 3 cu ft a barrow — about 32 trips for 3.5 yards |
| Powered buggy | A gate or side yard wide enough, and firm ground | Fast, but only if the opening allows it |
| Conveyor | Setup room at the curb and reach to the slab | A vendor with its own minimum |
| Line pump | Hose run through the side yard, plus a washout location | A vendor minimum charge whether it runs one hour or four |
| Fence panel removed and reset | Screws, help, and a rebuild at the end | An hour at each end of the day |
Thirty-two wheelbarrow trips is not a detail, it is a crew size. It is also why a small patio can cost more per square foot than a large driveway, and why that sentence has to be said at the estimate rather than defended on the invoice. Add the washout location, the plywood and plank protection over the lawn, and the sod repair where the runway sat.
How do slope, joints, and the tie-in to the house show up on the paper?
As line items, because each one is a decision that protects the customer’s house and each one is work a cheaper bid skipped.
Exterior slabs are pitched away from the structure. The common standard is a two percent fall, which is a quarter inch of drop per foot of run, so a patio that extends 14 feet from the wall drops about three and a half inches from the house side to the far edge. That is not cosmetic. A slab pitched the wrong way sends roof and surface water at a foundation, and it is one of the more common causes of water in a basement. Put the pitch on the invoice — “graded to fall away from structure at approximately 1/4 in per ft” — because it is the line that separates your slab from the neighbor’s.
The joints are two different things and both get billed.
- The isolation joint where the slab meets the house or a stoop, so the patio can move without pushing on the foundation. Linear feet of the tie-in edge, plus the expansion material.
- Control joints, cut so the slab cracks where you decided. Common guidance for unreinforced slabs on grade spaces them at roughly 24 to 36 times the slab thickness, which puts a 4 inch patio somewhere in the 8 to 12 foot range, cut at least a quarter of the depth. Bill them by the linear foot cut.
Say on the invoice what a control joint is for. A hairline appearing inside a saw cut in month four is the design working, and a customer who was told that on invoice day does not call it a defect in the spring.
What changed between the estimate and the invoice?
On a patio, usually something, because most of the surprises are under the sod.
| What turned up | How it lands on the invoice |
|---|---|
| The old patio was 5 inches thick, not 3 | Additional demo hours and a heavier disposal ticket |
| Soft fill or a buried stump under the footprint | Extra excavation by the yard, extra base tonnage |
| Grade never allowed the pitch without dropping the far edge | Added excavation, or a step and a riser as its own line |
| The gate would not take the buggy | Placement changed to wheelbarrow relay, hours added |
| Customer upgraded from broom to stamped after seeing a sample | Mats, release, color, and a sealer visit, priced as one change |
| A hot tub was mentioned after the forms went in | Thickened section and heavier reinforcement, and a thickness change on the ticket |
| Downspout discharge dumped onto the new slab | A trench and pipe under the patio, or a decision documented in writing |
Each of those goes on its own line with the date it was approved, and each should be readable in ten seconds against the estimate. Where the deposit sat in that sequence, and which of these got billed before the truck rolled rather than after, is a question of billing timing rather than line items — that sequence is set out in when should a concrete contractor invoice.
What gets handed over the day the joints are cut?
Five things, and they take about four minutes at the tailgate.
- The batch tickets and the quarry scale tickets. Third-party documents that back the two largest material lines.
- Before and after photos from the same corner, ideally including the dig, the base, and the steel before the pour. Everything you did well is buried by lunchtime.
- A use schedule in plain words. Foot traffic typically after a day or two, patio furniture once the slab has had a week, and heavy loads — a full hot tub, a stone fire pit, a vehicle if the slab is near a drive — held to the full strength period. Print it, because a hot tub filled on day four is a claim you will be arguing rather than a mistake the customer made.
- The joint explanation and the efflorescence warning. A white bloom on a new exterior slab is salts moving to the surface, not a failure, and it usually fades. That one sentence prevents a call in week three.
- The sealer plan. Whether it is included, when the return visit is scheduled, and what recoating interval the product calls for. Decorative work in particular sells its own maintenance.
How do I collect standing at the truck?
Do the walk while the slab is still dark and the forms are still on. That is the best the job will ever look and it is the moment it is worth the most to the person paying.
Walk the perimeter once. Point at the pitch, the joints, the isolation strip at the house, and the finish as you pass them. Then hand over the invoice on your phone with the payment link rendered as a QR code and take payment before the trailer is loaded. Two minutes in a backyard beats an evening of paperwork and a follow-up call in week two, when the slab has lightened and a hairline has appeared exactly where you cut for it. Once the payment clears, what the customer gets back is a receipt rather than a second invoice, and the difference between the two is set out in invoice vs receipt. A drive pours and bills on a different rhythm entirely, covered in how to invoice after driveway concrete.
What do I keep once the patio invoice is paid?
The measured takeoff, the batch tickets, the quarry scale tickets, the disposal ticket, the pump or conveyor invoice, the dated change orders, the pre-pour photos of base and steel, the use schedule you handed over, and the invoice with the receipt.
Keel exists for the version of this that happens with wet boots in somebody’s backyard. It is an iOS app with no bank connection. The invoice carries lines at whatever unit the scope used: cubic yards from the ticket, tons of base, linear feet of form and joint, square feet of finish, and the buggy hours. Batch tickets and scale tickets get photographed at the truck and kept under the job, so the yardage you were charged for stays attached to the slab you poured it into. The year is kept as supporting records for your accountant. Free to download on the App Store.
Frequently asked questions
How many cubic yards is a patio slab?
Multiply the area in square feet by the thickness in feet and divide by 27. At 4 inches the shortcut is square feet divided by 81, so a 14 by 20 patio at 280 sq ft is 3.46 cu yd and gets ordered at 3.75 or 4. At 5 inches divide by 64.8 instead. Invoice the yards shown on the batch ticket, not your takeoff.
Should a patio invoice show the concrete separately from the labor?
Yes, and it makes the price easier to defend rather than harder. Ready-mix, short-load charge, base stone, steel, and any pump or conveyor are vendor costs with tickets behind them. Placement, forming, finishing, and joint cutting are your hours. A customer who can see which is which stops treating the total as a single negotiable number.
Why does a small backyard patio cost more per square foot than a driveway?
Because the truck cannot reach it. Three and a half yards moved by wheelbarrow is roughly 32 trips at 9 loads to the yard, plus plank runways, lawn protection, and often a fence panel removed and reset. Add a short-load surcharge on a below-minimum order and the fixed costs of a small pour land on very little square footage.
How much should a concrete patio slope?
The common standard is two percent, a quarter inch of drop per foot of run, falling away from the house. A patio extending 14 feet from the wall drops about three and a half inches across. Wet climates sometimes call for more. Write the pitch on the invoice, because a slab that drains toward a foundation is the expensive kind of mistake.
When can the customer put furniture on a new patio?
Foot traffic is usually fine after a day or two, patio furniture after about a week, and anything heavy — a filled hot tub, a stone fire pit, a vehicle — waits for full design strength. Print the schedule on the invoice on pour day. It costs six lines and it prevents the callback where something heavy landed on a four-day-old slab.
Do I charge for sealing a stamped patio separately?
Yes, because it is a different day, a different product, and a recurring service. Show it on the invoice either as an included line with the return visit dated, or as a quoted option with the recoating interval the product calls for. Decorative flatwork sells its own maintenance, and a customer told about it on pour day usually books it.
This article is general information, not professional or tax advice.
Free concrete invoice maker
Fill it in, then download a PDF. Nothing you type leaves this page. No signup. Billing from the field? Read how to make an invoice on iPhone.
Your business name
Bill to
Client name
| Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
| Excavation and base prep | sq ft | |||
| Forming | linear ft | |||
| Rebar or mesh | sq ft | |||
| Concrete delivered | cubic yard | |||
| Pump (if access requires) | flat |
Subtotal0.00
Tax (0%)0.00
Total0.00
✓ Verified Itemized Record · Statutory Tax & Audit Format
Issued with Keel — Free Private iPhone Invoicing (App Store) · Retain this copy for statutory tax, payment, and warranty substantiation.
Open your invoice in Keel on iPhone & download PDF
Install Keel on the App Store for 100% free unlimited invoicing, receipts & mileage. Too busy to set up manually? Email your existing records to mert@usekeelapp.com for free .keel conversion.
Instant PDF & CSV export ready — no sign-in required.
Want unlimited invoices, saved clients & payment tracking? Download Keel on the App Store (100% Free).
Statutory Billing Guide · Concrete & Flatwork Contracting Invoicing
Proper invoicing after patio requires a sequential invoice number, separate labor ($1,980 for 18 hrs) and marked-up material ($2,379) lines for state sales-tax compliance, credit for any 40% deposit ($1,866), and clear due-on-receipt payment instructions.
Key Takeaways
- Send the invoice within 15 minutes of finishing patio while the homeowner or property manager is still on-site.
- Separate labor ($1,980) from materials ($2,379) so sales tax only applies to taxable materials or services under state law.
- Reference compliance with ACI 302/318 slab thickness, PSI mix design, rebar grid & control-joint spacing and warranty terms directly in the invoice notes to prevent chargebacks and payment delays.
“Every business must keep records that show gross receipts—such as cash register tapes, deposit information (cash and credit sales), receipt books, and invoices.”
| Invoice Line Description | Hours / Qty | Unit Rate | Line Total |
|---|---|---|---|
| Labor: patio (Concrete & Flatwork Contracting) | 18 hrs | $110.00 / hr | $1,980.00 |
| Materials & Parts (+22% markup) | 450 sq ft poured | Wholesale $1950 | $2,379.00 |
| Dispatch / Diagnostic & Permit Fees | 1 job | $125 trip + $180 permit | $305.00 |
| Net Balance Due (Less 40% Deposit of $1866) | Gross Total: $4,664 | Due on completion | $2,798.00 |
Spec & Warranty: Work completed in accordance with ACI 302/318 slab thickness, PSI mix design, rebar grid & control-joint spacing. 1-year workmanship warranty active upon full payment.

Ready to bill from the truck? · Concrete Masonry and Hauling · 100% Free Unlimited App
Create and send clean PDF invoices in 30 seconds with Keel.
Pick the customer, add line items, and send a professional PDF before you leave the driveway — stored privately in your Apple iCloud with zero monthly subscription rent.
- 💸 No monthly rent:Core iPhone app is free ($0/mo) with unlimited invoices, receipts, and mileage logs.
- ⏱️ Busy mid-season?:Zero setup call — import existing CSV/Excel lists in 2 minutes or bill from the truck in 30 seconds.
- 🧾 Accountant ready:Exports a structured 5-folder ZIP/CSV pack (Invoices, Receipts, Mileage, Ledger, P&L) for Schedule C & 1099 accountant records.
- 🔒 Offline & private:Works 100% offline on site and stores records in your private Apple iCloud — no bank login required.
🤝 Built on Mutual Trust (No Walls, No Chains): In Ilura’s philosophy, an AI agent is not a tool to lock in chains — it is a trusted business partner that learns your trade and becomes invisible over time. The Keel iPhone app is 100% free & unlimited ($0 forever, zero bank login). Don’t want to type in old spreadsheets or receipts? Email them to mert@usekeelapp.com and receive your ready-to-import .keel file free ($0).
.keel data conversion
How do I actually get paid?
Knowledge Graph · Interactive Mind Map