UK CIS Subcontractor Invoice Template (2026–2027 Guide)

Updated November 2, 2026 · ~7 min read · Ilura Technology · UK

Free handyman invoice maker

Fill it in, then download a PDF. Nothing you type leaves this page. No signup.

From
Bill to
Line items (up to 5 on web)

Your business name

Invoice

INV-0001

Bill to

Client name

DescriptionQtyUnitRateAmount
Minimum call-outflat
Labourhours
Half-day blockblock
Materials plus markupflat
Travel between sitesflat

Subtotal0.00

Tax (0%)0.00

Total0.00

✓ Verified Itemized Record · Statutory Tax & Audit Format

Issued with Keel — Free Private iPhone Invoicing (App Store) · Retain this copy for statutory tax, payment, and warranty substantiation.

QR code: Keel on the App Store
 Step 1 · Save & Export PDF (5 Free Saves)

Save your invoice in Keel iCloud Workspace & download PDF

Sign in with your Apple ID in 1 tap to save this invoice to your 5 free iCloud records, export a clean PDF, and open it on your iPhone for unlimited invoicing.

 Open in Keel on App Store (Free) → Free on iPhone ($0/mo) · Or 5 free saves in iCloud Workspace

Step 2 · Want unlimited invoices, saved clients & payment tracking? Open your iCloud Workspace on iPhone below.

HMRC CIS & VAT Notice 735 Desk · UK Construction Subcontractor Billing

Under HMRC Construction Industry Scheme (Finance Act 2004 / CISR) and Value Added Tax Act 1994 s.55A rules for "UK CIS Subcontractor Invoice Template: 20% Deduction & Reverse Charge VAT (2026–2027)", UK subcontractors must separate direct materials and plant hire (0% CIS deduction) from construction labour (20% verified CIS deduction; 30% unverified; 0% Gross Payment Status), and apply the Domestic Reverse Charge VAT notice when both subcontractor and main contractor are VAT-registered and CIS-reportable.

Key Takeaways

  • Separate Materials on the Invoice: HMRC CIS 20% deduction applies ONLY to labour and travel; if you lump £1,200 of materials into a £3,200 single-line invoice, the contractor must deduct 20% (£640 instead of £400) from the entire £3,200.
  • Domestic Reverse Charge VAT (Notice 735): On standard-rated (20%) or reduced-rated (5%) CIS-reportable supplies to a VAT-registered contractor (not an end user), do not charge cash VAT—state "Reverse Charge: VAT Act 1994 Section 55A applies (20%)" on the invoice.
  • Monthly CIS Payment & Deduction Statements: Keep every monthly contractor CIS statement to offset the 20% CIS tax already withheld against your SA103 Self Assessment tax and Class 4 NIC bill.
“Under the Construction Industry Scheme, contractors deduct money from a subcontractor’s payments (20% for registered subcontractors) on the labour portion after deducting VAT and the direct cost of materials, and pass it to HMRC as advance payment towards the subcontractor’s tax and National Insurance.”

HM Revenue & Customs (HMRC) · Construction Industry Scheme Guide (CIS 340) & VAT Domestic Reverse Charge Technical Guide (Notice 735)Verified 2026-04

UK CIS Subcontractor Invoice Template: 20% Deduction & Reverse Charge VAT (2026–2027)

Short answer: A compliant UK CIS subcontractor invoice template (or free CIS invoice app) for 2026–2027 must separate labour from direct materials and plant consumables, state your Unique Taxpayer Reference (UTR) and National Insurance or company number, show the 20% registered (or 30% unregistered / 0% gross) Construction Industry Scheme deduction on labour only, and include Domestic Reverse Charge VAT wording when both parties are VAT-registered.

⚡ Instant UK CIS Subcontractor Invoice & Free CIS Invoice App Toolkit (£GBP): Build your CIS subcontractor invoice with separated labour (20% CIS) and Screwfix/Travis Perkins materials (0% CIS) above, save your first 5 records in the iCloud Web Workspace (5 Free Saves), explore the UK Self Assessment & CIS App Store Edition, or Download Keel on the App Store (£0/mo Free CIS Invoice App) (uk-self-assessment). — click 🔗 Embed / CSV Template to export

If a UK bricklayer, groundworker, sparky, dryliner, carpenter, or roofing subcontractor lumps labour and materials onto a single line item, the main contractor is legally forced by HMRC’s Construction Industry Scheme (CIS) rules to deduct 20% (or 30%) CIS tax from the entire invoice total—including your materials. On a £4,000 invoice with £2,200 of timber and £1,800 of labour, failing to split the lines costs you £440 in immediate cash flow that stays locked up with HMRC until you file your annual Self Assessment return.

This guide gives you a copy-and-use 2026–2027 UK CIS subcontractor invoice template covering both non-VAT-registered sole traders and VAT-registered subcontractors operating under the 20% Domestic Reverse Charge (DRC). For deeper rules on verification and monthly PDS statements, see our UK CIS subcontractor invoice guide and UK domestic reverse charge VAT in construction.

What fields must a UK CIS subcontractor invoice template include in 2026–2027?

Before a main contractor’s accounts department processes your payment run for the CIS tax month (which runs from the 6th of one month to the 5th of the next), they check that your invoice carries every detail needed to verify you with HMRC and populate their monthly CIS300 return:

Invoice FieldWhy the Main Contractor Needs ItWhat Happens If You Leave It Off
Your trading name, legal name & addressMatches HMRC CIS verification databasePayment held until identity matches UTR
Unique Taxpayer Reference (10-digit UTR)Mandatory for HMRC CIS verificationMain contractor must deduct 30% emergency CIS rate instead of 20%
National Insurance Number (Sole Trader) or CRN (Ltd)Required alongside UTR for sole trader verificationVerification fails; triggers 30% deduction
Sequential Invoice Number, Issue Date & Tax PointStatutory bookkeeping & VAT requirementRejected by site quantity surveyor or accounts
Site address / Plot number & Work descriptionProves the work falls within CIS construction operationsDelays sign-off by site manager
Labour line(s) separated from Material line(s)CIS 20%/30% applies only to labour (and plant with operator)Contractor deducts 20% from your materials too
CIS Deduction Calculation (0%, 20%, or 30%)Shows Gross Total, Less CIS Deduction, and Net PayableConfusion over exact BACS transfer amount
Domestic Reverse Charge VAT notice (if VAT-registered)Required under VAT Act 1994 s 55A for CIS-reported suppliesInvoice returned for correction

How does the filled 2026–2027 UK CIS invoice template look (Non-VAT & VAT DRC examples)?

Template A: Non-VAT Registered CIS Sole Trader (20% Registered Rate)

Use this layout when your rolling 12-month turnover is below the £90,000 UK VAT registration threshold (see UK VAT registration threshold for sole traders):

Line Item DescriptionCategoryQty / DaysRate (£)Line Total (£)CIS Deductible?
1st Fix Carpentry — Plot 14 Oakfield Site (5 days labour)Labour5 days£260.00£1,300.00Yes (20% = £260.00)
C24 structural carcassing timber, joists, hangers & fixings (per Travis Perkins receipt attached)Materials1 lot£840.00£840.00No (0% CIS)
Gross Invoice Subtotal———£2,140.00—
Less: CIS Deduction at 20% on Labour (£1,300.00 × 20%)———−£260.00Credited to your HMRC UTR
Net Amount Payable by BACS to Subcontractor———£1,880.00—

Template B: VAT-Registered CIS Subcontractor (Domestic Reverse Charge 20% Applies)

When both you and the main contractor are UK VAT-registered, the contract is reported under CIS, and the main contractor is not an “End User” (such as the property owner or developer occupying the building), you do not add 20% VAT to the net total Payable. Instead, you state the reverse-charge VAT amount for the contractor to account for on their own VAT return:

  • Labour (CIS subject): £2,000.00
  • Materials (CIS exempt, actual cost excluding VAT): £1,000.00
  • Total Net Invoice (Before VAT & CIS): £3,000.00
  • VAT at 20% (£600.00) — NOT CHARGED: “Customer to account to HMRC for the reverse charge output tax on the VAT-exclusive price of items marked ‘reverse charge’ at the relevant VAT rate (VAT Act 1994 Section 55A applies).”
  • Less: 20% CIS Deduction on £2,000.00 Labour: −£400.00
  • Total Cash Payable by Main Contractor: £2,600.00

How do you price materials on a CIS invoice so you don’t lose CIS on your markup?

Under HMRC CIS Manual CISR15060, the material deduction exclusion applies strictly to “the direct cost of materials used or to be used in carrying out the construction operations.”

  1. If you are not VAT-registered: The direct cost of materials includes the VAT you paid at the builders’ merchant (since you cannot reclaim that input VAT).
  2. If you are VAT-registered: The direct cost of materials is the net (ex-VAT) price you paid at the merchant.
  3. What about material markup? HMRC states that if a subcontractor marks up materials significantly above actual cost, the profit markup element is technically subject to CIS deduction if challenged. Always keep the merchant receipts attached or logged so the main contractor can verify your materials line without deducting 20% from it.

What about plant hire, scaffolding, fuel, and travel expenses on a CIS invoice?

One of the most frequent disputes between subcontractors and quantity surveyors in 2026–2027 is which non-material items go into the CIS-deductible labour bucket versus the CIS-free materials bucket:

Item Billed on Subcontractor InvoiceTreated as Labour (20% CIS Deducted) or Materials (0% CIS)?HMRC CISR15000 Rule
Hired plant/machinery (mini-digger, cherry picker, skip) from a third-party hire companyMaterials (0% CIS)Deductible as a material cost if you hired it in from an external plant-hire company and pass on the hire charge
Plant or machinery that YOU own yourselfLabour (20% CIS deducted)If you own the mini-digger or van yourself, HMRC does not allow a material deduction for its hire value; only consumable fuel used by the machine qualifies as materials
Travel, subsistence, accommodation & mileage recharged to contractorLabour (20% CIS deducted)Recharged travel, hotel, and mileage allowances on a CIS invoice are treated by HMRC as part of the gross CIS payment subject to 20% deduction
Scaffolding hire (supply only vs supply-and-erect)0% CIS if pure equipment hire; 20% CIS on erection/dismantling labourSplit scaffolding hire fee from erection labour

When must the main contractor give you your CIS Payment and Deduction Statement (PDS)?

Under HMRC regulations for 2026/27 and 2027/28, the CIS tax month ends on the 5th of every month, and the main contractor must submit their CIS300 return and issue your written CIS Payment and Deduction Statement (PDS) by the 19th of that same month (within 14 days of the end of the tax month).

Never throw a PDS away: those monthly statements are your proof to HMRC of the 20% tax already deducted at source when you file your UK Self Assessment tax return and reduce your UK payments on account.

Frequently asked questions

What happens if I don’t separate labour and materials on my UK CIS invoice?

If you submit a single lump-sum figure combining labour and materials without itemizing the direct cost of materials, the main contractor is required by HMRC to deduct 20% (or 30% if unregistered) CIS tax from the entire invoice total—meaning you lose 20% of your material reimbursement upfront until the end of the tax year.

Do I charge CIS deduction on VAT or before VAT?

CIS deductions are always calculated on the VAT-exclusive labour total, never on the VAT element. Furthermore, when both the subcontractor and main contractor are VAT-registered and the supply is reported under CIS (with no End User exemption), the 20% Domestic Reverse Charge applies so no VAT cash changes hands at all.

Is travel or mileage recharged to a main contractor subject to 20% CIS deduction?

Yes. Under HMRC CIS rules, any travel expenses, mileage, fuel for your own van, or overnight accommodation that you recharge to the main contractor on your invoice counts as part of your gross taxable payment and must have 20% CIS deducted from it by the contractor. You still claim your actual allowable travel or 45p mileage deduction on your own Self Assessment return.

How do I qualify for 0% Gross Payment Status (GPS) under CIS in 2026–2027?

To qualify for 0% Gross Payment Status so contractors pay you 100% with zero CIS withheld, you must pass three HMRC tests: the Business Test (carrying out construction in the UK and operating via a bank account), the Turnover Test (at least £30,000 net construction turnover excluding VAT and materials for a sole trader), and the Compliance Test (filing and paying all Self Assessment, VAT, and PAYE obligations on time over the past 12 months).

What is the exact Domestic Reverse Charge wording to put on a UK CIS invoice?

HMRC accepts any clear statement on your invoice that references Section 55A of the Value Added Tax Act 1994, such as: “Domestic Reverse Charge applies — VAT Act 1994 Section 55A. Customer to pay the output VAT at 20% directly to HMRC on their VAT return.”


This article is general tax information, not personalized tax advice. Confirm CIS and VAT rules with HM Revenue & Customs (gov.uk) or a qualified UK accountant.

Create CIS-ready invoices with automatic labour/material splits and track your monthly 20% CIS deductions on-device with Keel on the App Store.

Worked Example — UK Subcontractor Invoice with 20% CIS Deduction & Domestic Reverse Charge VAT in GBP (uk-cis-subcontractor-invoice-template)
UK CIS Invoice LineHMRC CIS / VAT RuleWorked Subcontract Invoice (£)Net Cash Paid by Contractor
1. Construction Labour (5 Days On-Site)Subject to 20% verified CIS deduction£2,000.00 gross labourLess £400.00 CIS → £1,600.00 cash
2. Direct Materials & Plant Hire (Ex-VAT)Exempt from CIS deduction if itemized£1,200.00 materials at cost£1,200.00 paid 100% in full
3. Domestic Reverse Charge VAT (20%)VAT Act 1994 s.55A (£3,200 × 20% = £640)£0.00 cash VAT (Contractor self-accounts)£0.00 cash VAT on invoice
Total Subcontractor Remittance£3,200.00 gross less £400.00 CIS credit£400.00 credited to SA103 tax bill£2,800.00 net bank transfer

If the client is an End User (homeowner or property developer not reselling construction services), normal 20% cash VAT applies instead of Domestic Reverse Charge.

Architecture & Decision Map 4-Zone Dispute-Proof Invoice Anatomy
4-Zone Anatomy of a Dispute-Proof Itemized Invoice Visual breakdown of the 4 zones of an itemized trade or freelance invoice: Header & Licence, Materials & Deliverables, Skilled Labour & Code Compliance, and Tax Split & Calendar Due Date. ZONE 01 · HEADER & LEGAL IDENTITY Sequential ID + Calendar Due Date INV-2026-042 · Trade Licence / ABN / HST # Client AP Contact + Job Address / PO # ZONE 02 · FIXTURES, PARTS & DELIVERABLES Spec Clarity Without Wholesale Leak List brand, model & quantity installed Separates taxable materials from labour ZONE 03 · SKILLED LABOUR & DIAGNOSTICS Documented Scope Performed Diagnostic test, installation, haul-away & test Eliminates "why did 2 hours cost $600?" pushback ZONE 04 · TAX SPLIT, WARRANTY & SETTLEMENT Subtotal + Jurisdiction Tax + Deposit Credit Written workmanship warranty + Net terms Sent as non-editable PDF before leaving site
UK subcontractor CIS & Domestic Reverse Charge invoice flow for UK CIS Subcontractor Invoice Template: 20% Deduction & Reverse Charge VAT (2026–2027): splitting 20%-deductible labour from 0%-CIS materials.  Build an itemized invoice in Keel Studio →
UK CIS Subcontractor Invoice Template: 20% Deduction & Reverse Charge VAT (2026–2027) — UK (HMRC) contractor and sole-trader workbench with organized supply receipts, mileage logbook, and tax records
Splitting direct material receipts from subcontractor labour prevents main contractors from deducting 20% CIS from your material outlay. Save to Keel Studio (5 Free) →

Ready to bill the job?

Create and keep your invoices with Keel.

Pick the customer, add the lines, send a clean PDF.

Free to download · No bank connection · See invoices in Keel

The invoice → Getting paid

How do I actually get paid?

Terms, chasing, and what to do when it is late.

Appliance Repair Customer Won't Pay? Hold the Unit or Send a Demand Appliance repair customer won't pay? A unit in your shop can be held under a possessory lien; an in-home repair can't, so send a demand and weigh small claims. Continue →

Knowledge Graph · Interactive Mind Map

Where this topic connects in the Keel graph

Open full Mind Map →