Payment Claim Construction Contracts Act NZ: Tradie Guide

Updated November 2, 2026 · ~7 min read · Ilura Technology · NZ

Inland Revenue (IRD) Desk · New Zealand Sole Trader Rules

Operating as a New Zealand sole trader under "NZ Construction Contracts Act Payment Claim & Payment Schedule Guide for Tradies (2026–27)" requires filing an annual IR3 individual income tax return for the 1 April–31 March tax year, paying ACC Earners’ and Work levies, managing Schedular Payment (WT) withholding if applicable, and paying Provisional Tax in 3 instalments once Residual Income Tax (RIT) exceeds NZ$5,000.

Key Takeaways

  • NZ$60,000 GST Threshold: Register for 15% GST once annual turnover reaches NZ$60,000; display your IRD/GST number and taxable supply information on all invoices over NZ$200.
  • NZ$5,000 Provisional Tax Trigger: If your Residual Income Tax (RIT) exceeds NZ$5,000, IRD requires 3 Provisional Tax instalments (28 Aug, 15 Jan, 7 May) using the 105% standard uplift or AIM method.
  • ACC Levies & 7-Year Records: Budget 1.5%–3.5% of net liable earnings for ACC CoverPlus levies, and retain all digital receipts and logbooks for 7 years under the Tax Administration Act 1994.
“If you are a sole trader in New Zealand, you pay income tax on your net profit by filing an IR3 individual income tax return after the end of the tax year on 31 March, and you must register for 15% GST if your turnover exceeds NZ$60,000.”

New Zealand Inland Revenue (IRD) · IR320 — Smart Business: A Guide for New Businesses and Sole Traders in New ZealandVerified 2026-04

NZ Construction Contracts Act Payment Claim & Payment Schedule Guide for Tradies (2026–27)

Short answer: Serving a valid payment claim Construction Contracts Act NZ (CCA 2002 Section 20) triggers strict statutory “pay now, argue later” rights for Kiwi builders, plumbers, sparkies, and subcontractors. Every CCA payment claim must be in writing, identify the construction work and period it relates to, state the claimed amount and due date, show how the figure was calculated, state that it is made under the Act, and attach the prescribed Form 1 notice — forcing the payer to either pay in full or serve a written Section 21 Payment Schedule by the due date.

⚡ Instant NZ Tradie Payment Claim, Quote & 15% GST Invoice Generator ($NZD): Build an itemised NZ construction invoice or progress claim with automatic 15% GST (3/23) and NZBN / Taxable Supply Information (TSI) fields in the interactive Free NZ Invoice & Quote Generator below (or click 🔗 Embed / CSV Template), save up to 5 Free Saves in your iCloud Web Workspace, explore the AU/NZ Tradie & Sole Trader App Store Edition and Estimates & Quotes Edition, or Download Keel Free on the App Store ($0/mo Core) (au-nz-tradies).

In New Zealand construction, sending an ordinary invoice without the mandatory statutory wording of the Construction Contracts Act 2002 (CCA) leaves a tradie exposed when a main contractor or residential homeowner stalls payment. Since the 2015 CCA amendments removed the old distinction between commercial and residential contracts for payment claims and adjudication, every residential and commercial construction contract in New Zealand is covered by the Act’s default payment regime.

Below is the complete 2026–27 New Zealand guide to drafting a compliant payment claim Construction Contracts Act NZ (Section 20), responding with or enforcing a Payment Schedule (Section 21), and combining your CCA payment claim with Inland Revenue (IRD) Taxable Supply Information (TSI) so one PDF serves as both a statutory payment claim and a 15% GST tax invoice. For related Kiwi tradie guides, see how to invoice as a contractor in NZ, NZ tradie variations and retentions, and NZ quote template.

What must a valid payment claim Construction Contracts Act NZ (Section 20) include?

Under Section 20 of the Construction Contracts Act 2002, an invoice or progress claim only activates the Act’s statutory enforcement remedies (statutory debt recovery under Section 23 and right to suspend work under Section 24A) if it meets all seven requirements:

CCA Section 20 RequirementWhat Must Appear on Your NZ Tradie Invoice / ClaimWhat Happens If You Leave It Off
1. In writing (s 20(2)(a))A written PDF or paper document served on the payerVerbal payment demands cannot trigger CCA default liability
2. Identify the construction work & period (s 20(2)(b)–(c))Site address, contract/job reference, and the exact start and end dates the work covers (e.g., Progress Claim #2: Framing & Roof Truss Install, 1–31 Oct 2026)Payer can dispute the claim as invalid for failing to specify the work period
3. State the claimed amount & due date (s 20(2)(d))Clear subtotal, 15% GST (if registered), total $NZD claimed, and the exact payment due date (default is 20 working days after service if the contract has no written payment terms)Without a stated due date, the statutory Section 22 default clock is harder to enforce
4. Indicate how the payee calculated the amount (s 20(2)(e))Itemised breakdown: quoted contract stage %, labour hours × rate, materials, plus approved written variations and less prior payments/retentionsLump-sum “For work done: $15,000” claims are routinely struck down for lacking a calculation breakdown
5. State that it is made under the Act (s 20(2)(f))Exact sentence printed on the face of the invoice: “This is a payment claim made under the Construction Contracts Act 2002.”Critical: Without this sentence, the document is only a standard invoice, not a CCA payment claim
6. Attach Form 1 Information Notice (s 20(3))Mandatory on all payment claims: attach Form 1 of the Construction Contracts Regulations 2003 outlining the payer’s rights and obligationsOmitting Form 1 invalidates the payment claim across both residential and commercial jobs

How does the “Pay Now, Argue Later” (Section 21 & Section 22) clock work?

Once you serve a valid Section 20 Payment Claim (with Form 1 attached), the payer (main contractor, developer, or homeowner) cannot simply ignore your invoice. Under Sections 21 to 24A of the CCA, the legal clock runs as follows:

  1. Step 1 — Payment Claim Served (Day 0): You email or deliver your combined Payment Claim / GST Tax Invoice + Form 1 Notice.
  2. Step 2 — Payer Must Serve a Payment Schedule or Pay (By the Due Date / Default 20 Working Days):
    • If the payer agrees with your claim, they pay the claimed amount in full by the due date.
    • If the payer disputes all or part of your claim, they must serve a valid written Payment Schedule (Section 21) before the due date stating the scheduled amount they propose to pay, how they calculated it, and their specific reasons for withholding the difference, and pay the undisputed scheduled amount by the due date.
  3. Step 3 — What If the Payer Sends No Payment Schedule and Doesn’t Pay (Section 22 Statutory Debt)?
    • Under Section 22, if the payer fails to serve a valid Payment Schedule within the time allowed and fails to pay by the due date, the entire claimed amount becomes a statutory debt due (Section 23).
    • In court recovery proceedings for a Section 23 debt, the payer is barred from raising counterclaims or set-offs about alleged defects (they must pay first and adjudicate separately).
    • You may also serve a 5-working-day written notice of intention to suspend work (Section 24A).

How do you combine a CCA Payment Claim with IRD Taxable Supply Information (TSI)?

You do not need to send two separate documents (one Payment Claim and one GST Invoice). Under the Goods and Services Tax Act 1985 (s 19E–19K), a single document acts as both a CCA Section 20 Payment Claim and valid IRD Taxable Supply Information (TSI) when it includes:

Threshold (Incl. 15% GST)Required IRD TSI Fields + CCA s 20 Fields on One Document
Up to $200 incl. GSTYour name/trading name, date of issue, description of construction work, total consideration, and CCA Section 20 statement + Form 1
$200.01 to $1,000 incl. GSTAll of the above plus your IRD GST registration number (XXX-XXX-XXX) and a clear breakdown showing either the 15% GST amount or that the total includes 15% GST
Over $1,000 incl. GSTAll of the above plus the recipient’s name and contact/site details and the itemised quantity/calculation of the construction supply

Cash-flow tip for Kiwi tradies: If your annual turnover is $2 million or less (excl. GST), make sure your myIR GST account is set to the Payments Basis (Cash Basis). That way, serving a $23,000 CCA Payment Claim does not trigger a $3,000 GST bill to IRD until the client actually pays the claim.

Add this block to the notes/terms footer of your construction invoice template (and attach the prescribed MBIE Form 1 sheet):

PAYMENT CLAIM NOTICE (CONSTRUCTION CONTRACTS ACT 2002)
This is a payment claim made under section 20 of the Construction Contracts Act 2002.
Work Period Covered: [Start Date] to [End Date] · Site: [Job Address]
Due Date for Payment or Payment Schedule: [Due Date]
Please see the attached Form 1 (Information That Must Accompany All Payment Claims)
for your statutory obligations under sections 21–24A of the Act.

How to track NZ construction progress claims, variations, and retentions in Keel

Keeping every quoted stage, signed variation email, progress payment claim, and retention release date under a single job folder in Keel ($0/mo Core on iPhone & iCloud Web Workspace) ensures that your Section 20 calculation breakdown and your 7-year Inland Revenue (IR3 + GST101A) audit trail stay 100% aligned without linking a bank feed.

Frequently asked questions

Is a tax invoice the same as a payment claim under the Construction Contracts Act NZ?

A standard tax invoice only becomes a valid payment claim under the Construction Contracts Act 2002 if it meets all Section 20 requirements—including stating the construction period, showing how the amount was calculated, printing the sentence “This is a payment claim made under the Construction Contracts Act 2002”, and attaching the prescribed Form 1 notice.

Do residential jobs need Form 1 attached to a payment claim in New Zealand?

Yes. Since the 2015 reforms to the Construction Contracts Act 2002 (s 20(3)), Form 1 (Information that must accompany all payment claims) must be attached to every payment claim in New Zealand, whether the client is a commercial head contractor or a residential homeowner.

How many days does a client have to respond to a CCA payment claim in NZ?

If your written construction contract specifies a due date for Payment Schedules and payment, that contract date applies. If there is no written provision, Section 18 and Section 22 of the CCA set the default deadline at 20 working days after the payment claim is served.

What happens if a client disputes my invoice by phone but sends no written Payment Schedule?

A phone call does not satisfy Section 21 of the Construction Contracts Act 2002, which requires a Payment Schedule to be in writing, state the scheduled amount, and explain the reasons for any difference. If no written Payment Schedule is served before the deadline, the full claimed amount becomes recoverable as a statutory debt under Section 23.

Can I charge 15% GST on retentions held back on a CCA payment claim?

Under Section 9(3)(aa) of the Goods and Services Tax Act 1985, even if you account for GST on the Invoice (Accrual) basis, GST on construction contract retentions is only triggered at the earlier of when the retention money is actually paid or an invoice is issued specifically for the retention release. On the Payments Basis, GST is always paid only when the cash arrives.


This guide is general information based on the New Zealand Construction Contracts Act 2002 (MBIE) and the Goods and Services Tax Act 1985 (Inland Revenue) for 2026–27 and is not legal or tax advice. Consult building.govt.nz, ird.govt.nz, or a New Zealand construction lawyer or accountant.

Worked Example — New Zealand Sole Trader IR3, 15% GST & ACC Levy Model in NZD (nz-construction-contracts-act-payment-claim-and-payment-schedule-guide)
IRD / ACC ComponentNZ Statutory Rule (1 Apr – 31 Mar)NZ$92,000 Gross Sales ExampleNet Tax / Levy Impact (NZD)
Gross Sales (Incl. 15% GST)3/23rds GST fraction (Mandatory > NZ$60k)NZ$92,000 incl. GST (NZ$80,000 ex-GST)NZ$12,000 GST collected
IR10 Business Expenses & Km ClaimNZ$16,100 expenses (incl. NZ$2,100 GST) + 8,000 kmNZ$14,000 ex-GST + NZ$8,320 km claimNet GST to IRD: NZ$9,900
Net Profit on IR3 ReturnEx-GST Revenue minus allowable deductionsNZ$80,000 - NZ$22,320 = NZ$57,680Triggers Provisional Tax (>NZ$5k RIT)
NZ Income Tax + ACC Work/Earners Levy10.5% to $15.6k · 17.5% to $53.5k · 30% to $78.1kNZ$9,522 income tax + ~NZ$1,380 ACCNZ$10,902 total (18.9% effective)

Calculated using updated NZ personal income tax thresholds (effective 31 July 2024 / 2025–26 tax year) and 15% GST.

Architecture & Decision Map Sole Trader Tax & GST Compliance Loop
Self-Employed Sole Trader Tax & GST/HST Compliance Cycle Four-stage compliance timeline for sole traders across AU, CA, UK, IE, and NZ: Per-Job Tax Invoices, Registration Threshold Monitoring, Periodic GST/HST/BAS Returns, and Annual Self-Assessment. 01 · EVERY JOB Tax Invoices & Vouchers Issue ABN / GST / HST invoice; snap supplier receipts & log work km. 02 · THRESHOLDS GST / VAT Watch AU: $75k AUD CA: $30k CAD NZ: $60k NZD UK: £90k GBP 03 · PERIODIC BAS & Instalments Net GST collected minus input tax credits + PAYG / Preliminary / Provisional tax. 04 · YEAR END Annual Return AU: myTax Business CA: Form T2125 IE: ROS Form 11 NZ: IR3 & IR265 UK: SA103 Return
New Zealand sole trader workflow for NZ Construction Contracts Act Payment Claim & Payment Schedule Guide for Tradies (2026–27): linking 15% GST taxable supply invoices, IR10 deductions, IR3 net profit, and ACC levies.  Run GST & sole-trader calculations in Keel Studio →
NZ Construction Contracts Act Payment Claim & Payment Schedule Guide for Tradies (2026–27) — New Zealand (IRD) contractor and sole-trader workbench with organized supply receipts, mileage logbook, and tax records
Logging GST-inclusive receipts and business kilometres throughout the 1 April–31 March tax year keeps myIR GST and IR3 returns effortless. Save to Keel Studio (5 Free) →
NZ Tax Invoice Maker

Generate an IRD-Compliant NZ Tax Invoice (15% GST)

Create a clean New Zealand contractor or sole trader invoice in our free invoice maker with automatic 15% GST math in seconds.

 Get on App Store (Free) · Australia and NZ Sole Traders → Open Invoice Generator →

Ready to bill the job?

Create and keep your invoices with Keel.

Pick the customer, add the lines, send a clean PDF.

Free to download · No bank connection · See invoices in Keel

The invoice → Getting paid

How do I actually get paid?

Terms, chasing, and what to do when it is late.

Appliance Repair Customer Won't Pay? Hold the Unit or Send a Demand Appliance repair customer won't pay? A unit in your shop can be held under a possessory lien; an in-home repair can't, so send a demand and weigh small claims. Continue →

Knowledge Graph · Interactive Mind Map

Where this topic connects in the Keel graph

Open full Mind Map →