Gutter Installation Invoice Template: Feet, Drops, Stories
Short answer: A gutter installation invoice template bills two units on separate lines: linear feet of gutter and the count of downspouts, priced by how many stories each drop runs. Name the material and gauge — .027 or .032 aluminum, copper, galvanized — then list miters and end caps by count, guard by the foot, tear-off and disposal as its own line, and fascia repair only if you actually opened it.
A gutter job looks like the simplest invoice in the trades: measure the roofline, multiply by a rate, done. That is exactly why so many of them lose money. The feet are the visible half of the work and the drops, the corners, and the second story are the half that ate the afternoon. The pre-job document is in gutter estimate template, and the general field checklist is in what to include on an invoice.
What has to be on a gutter installation invoice?
Seven blocks. The material block does more work here than in most trades, because two gutters that look identical from the street can differ by a factor of five in what the coil cost you.
| Block | What it has to say |
|---|---|
| Property and elevations | Address, roof style, which elevations were run — front, left, rear, right |
| Run measured | Total linear feet, and the split by elevation if the price differs by height |
| Profile and material | 5 in or 6 in, K-style or half-round, aluminum gauge, copper, galvanized, steel |
| Drops | Downspout count, size (2x3 or 3x4), average length each, and the story each one runs |
| Fittings | Inside and outside miters, end caps, offsets and elbows, hangers and spacing |
| Removal | Linear feet of old gutter torn off, and where it went |
| Conditional work | Fascia repair, drip edge, underground tie-in — filled in or struck through, never silently dropped |
Hanger spacing belongs on the page. A run screwed with hidden hangers every two feet and a run with hangers every four feet are the same linear footage and not the same gutter, and the customer comparing your invoice to a cheaper one has no other way to see the difference.
Why do downspouts get invoiced separately from the linear feet?
Because the per-foot rate hides them, and downspouts are where the labor is. A drop is a hole cut and sealed, an outlet fitted, two or three elbows formed and riveted, a length cut to fit, straps into siding or brick, and a discharge that has to point somewhere sensible. None of that scales with the length of the horizontal run.
It also matters that drop count is not a preference. Sizing guidance commonly puts one downspout per 30 to 40 linear feet of gutter, with the spacing tightened for steep roofs and large drainage areas. If the customer asked for two drops on a 140-foot run to save money, the invoice should say what you installed and note the recommendation, because the overflow complaint is coming to you.
| Drop condition | What changes | How it bills |
|---|---|---|
| Single story, straight to grade | Ladder, one or two elbows | Base rate per drop |
| Two story | Longer stock, upper ladder work above the roof edge, extra straps | Well above the single-story rate — often close to double |
| Three story or over a roof | Staging, a second person, sometimes a lift | Priced as its own line with the access method named |
| Offset around soffit or bay | Two extra elbows, a jog cut and riveted | Per-drop adder |
| Tie into underground PVC | Adapter, seal, sometimes a dig | Per-connection line |
Access is also the line item your insurer cares about. A ladder used to reach an upper landing has to have its side rails extend at least three feet above that surface, or be secured with a grasping device, under OSHA’s construction ladder standard. Setting up correctly on a three-story gable takes time that a per-foot rate does not contain, which is another reason the drop and the elevation belong on the invoice as their own lines.
What does the material line have to name?
Profile, gauge, finish, and where the coil came from. These are not the same product.
| Material | What it changes | Notes for the invoice |
|---|---|---|
| .027 aluminum | The common builder-grade coil | Name the gauge, because .027 dents from a ladder in a way .032 does not |
| .032 aluminum | Heavier coil, better on long runs and snow country | Costs more per foot and is worth saying so on the page |
| Steel, galvanized or galvalume | Stiffer, heavier, seams behave differently | Rarely run seamless on a residential machine |
| Copper | Soldered joints, no rivets, different skill and different day | Several times the material cost of aluminum, and the labor is not comparable |
Seamless work adds a line most invoices leave off: the machine came to the property. Bringing the roll former, setting it up, running the stock, and breaking it down is real time that has nothing to do with the length of the run, which is why a 42-foot single-elevation job is not one fifth of a 214-foot job.
How do the estimate lines carry over when the run measured out differently?
Restate the estimate’s lines in the same order and change only the quantities, with the measured figure printed next to the quoted one. Ground measurements taken from a driveway are close, not exact, and a customer who sees 214 lf on the invoice against 208 lf on the estimate needs one sentence, not a phone call.
What is not allowed is quietly folding a new item into an existing line. If the rear elevation turned out to be two stories rather than one, that is a new numbered line naming the elevation, not a bigger number on line 5.
What does a filled-in gutter invoice look like?
Placeholder rates from one contractor so the arithmetic can be followed. Substitute your own.
Invoice 2026-0446 · Ranch with two-story rear addition · 5 in K-style, .032 aluminum, hunter green · Hidden hangers at 24 in o.c. · Crew of 2, on site 7:20 a.m. to 4:10 p.m.
| # | Line | Qty | Unit | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Tear-off and disposal of existing gutter and downspouts, all elevations, hauled off site | 214 | lf | 1.35 | 288.90 |
| 2 | Seamless 5 in K-style, .032 aluminum, formed on site, hidden hangers 24 in o.c., sealed outlets | 214 | lf | 9.25 | 1,979.50 |
| 3 | Miters — 4 outside, 3 inside, hand-formed and sealed | 7 | ea | 28.00 | 196.00 |
| 4 | End caps, riveted and sealed | 6 | ea | 9.00 | 54.00 |
| 5 | Downspouts 3x4, single story — front, left, right elevations, avg 11 ft, elbows and straps | 4 | drop | 96.00 | 384.00 |
| 6 | Downspouts 3x4, two-story rear addition — 24 ft each, upper ladder work, additional straps | 2 | drop | 178.00 | 356.00 |
| 7 | Fascia board replacement — rot at NE corner, found after tear-off, photo 4, approved on site 9:50 a.m. | 16 | lf | 14.50 | 232.00 |
| 8 | Aluminum micro-mesh guard, screwed to the hanger, all elevations | 214 | lf | 7.40 | 1,583.60 |
| 9 | Underground tie-in to existing 4 in PVC, front two drops, adapters and seal | 2 | ea | 85.00 | 170.00 |
Invoice total 5,244.00 · Deposit received at contract 1,500.00 · Balance due 3,744.00
Two things to notice. The two two-story drops on line 6 cost more than the four single-story drops on line 5, on a third of the count. And the guard on line 8 is 30 percent of the ticket by itself, which is why guard belongs on its own line with its own margin rather than absorbed into a per-foot gutter rate.
How do I bill fascia rot that only showed up after the old gutter came off?
As a change order written the moment the wood is visible, before the new gutter goes up. Three things go on that line: what you found, a photo number, and the time the customer approved it.
The estimate should already have carried a conditional row — “fascia repair, if required, $X per linear foot, quantity unknown until tear-off” — with no dollar figure in the quoted total. Then the invoice fills in the quantity at the rate the customer already accepted, and nobody is negotiating price while standing on a ladder.
Rot is the common one; it is not the only one. Drip edge missing behind the old gutter, a roof edge with no starter, siding that has to come loose to strap a drop, and a soffit that was never vented all fall into the same category: unknown until the old system is down, priced in advance as a rate, filled in on the invoice as a quantity.
How do I invoice cleaning and repair, which are not per-foot jobs?
Different service, different unit. Charging cleaning by the linear foot punishes you on a tight two-story with landscaping under every ladder set and overpays you on an open ranch.
| Service | Practical unit | What moves it |
|---|---|---|
| Cleaning | Per visit, by story and house footprint | Guard removal and reinstall, roof pitch, ladder access, debris volume, whether downspouts have to be flushed |
| Downspout unclogging | Per drop | Snake, blow out, or disassemble; underground lines are their own problem |
| Re-hang and re-pitch | Per linear foot of the section corrected | Existing hanger type, whether the fascia holds a screw |
| Leak repair | Per seam or per section, against a minimum | Seal versus replace; a soldered copper joint is a different job |
| Section replacement | Per linear foot, plus a trip minimum | Matching an existing profile and color |
Every one of these needs a stated minimum charge on the invoice. A twenty-minute reseal that took a forty-minute round trip is not a twenty-minute job, and the minimum is what says so without an argument.
How do I check the per-foot price actually paid for the coil and the crew?
Work up from your own costs; use published ranges only to confirm you are in the same universe.
Material per foot. Take the coil roll price divided by the linear feet it yields, then add hangers at your actual spacing, screws, rivets, sealant, and outlets. Formed miters and end caps come off the same coil, so count them. Do this once for each material you offer, because .027 aluminum and copper produce completely different sheets.
Labor per foot. Time a real day. Two people, tear-off, machine setup, hanging, drops, cleanup, and drive. Divide the day’s finished footage by crew hours and you have a production rate. That number, not a guess, converts your loaded hourly cost into a cost per foot — and it drops hard on a cut-up roofline with eight miters compared to a straight ranch.
Overhead. Truck and trailer, the machine payment, insurance, license, fuel, phone, and dump fees, divided across the feet you actually install in a month.
Margin, and the mistake that eats it. Suppose material and consumables land at $2.90 a foot. A 35 percent markup gives $3.92, and the $1.02 you added is 26 percent of that price, not 35. To earn a 35 percent margin you divide by 0.65 and charge $4.46. Markup is a percentage of cost; margin is a percentage of price. Bidding one while budgeting the other is how a busy season ends with nothing in the account.
Prices per foot vary widely by region, roof height, material, and how cut-up the roofline is. Treat any published range as a check on your arithmetic, not as a rate card.
When does a gutter customer pay?
Same day, at walkthrough. Gutter work finishes in a single visit on most houses, and the moment to collect is while you are standing in the yard pointing at the drops with the customer.
Take a deposit that covers the coil on any job with special material — copper, an odd color, 6-inch, or a large guard order — because that stock is not resellable. On the balance, run water through the system while they watch, hand over the invoice, and put the payment link in front of them as a QR code on your phone. Builder and property-manager accounts on net terms need a due date, a stated late fee, and a follow-up you actually send; the mechanics are in how to get clients to pay.
What do I keep after the gutter invoice goes out?
Photos of the fascia before the new gutter covered it, the coil and guard supplier invoices, the measured run by elevation, the color and gauge, and your mileage for the job and the supply runs. The photos settle warranty questions; the supplier invoices are the deductible material cost, which is covered more generally in self-employed tax deductions.
Keel is an iOS app that runs entirely on the device — no account, no bank connection, no cloud, no login, and an App Store privacy label that reads Data Not Collected. The invoice gets raised in the driveway with the elevation-by-elevation footage and the drop count typed straight into the lines, your own numbering sequence, your logo and brand color, and a payment link the customer scans off the screen before the ladders are strapped down. The supply house receipt for a coil roll and two cartons of guard is photographed at the counter and read on device by Apple Intelligence. Supply runs are logged as trips. The ledger is append-only and hash-chained, so the job date and the numbers on it stay as recorded. At year end it exports as one file, or as the Accountant Pack: a CSV plus a one-page summary PDF. Free is $0 with unlimited invoices, receipts, and mileage; Keel Pro is a one-time $249.99 Lifetime purchase, not a subscription.
Frequently asked questions
What should a gutter installation invoice include?
The address and which elevations were run, total linear feet with the split by elevation, the profile and material with the aluminum gauge named, downspout count with size and the story each drop runs, miters and end caps by count, hanger type and spacing, tear-off and disposal footage, any guard by the foot, and conditional work such as fascia repair filled in with its quantity.
Should downspouts be priced separately from linear feet?
Yes. A drop is a fixed piece of labor — outlet cut and sealed, elbows formed, straps set, discharge aimed — that does not scale with the length of the horizontal run. Bill drops by count, and split single-story from two-story, because an upper drop needs longer stock, ladder work above the roof edge, and extra straps.
How do I charge for gutter cleaning instead of installation?
By the visit, priced on stories and house footprint, not by the linear foot. Add for guard removal and reinstall, steep pitch, landscaping that blocks ladder placement, heavy debris, and flushing downspouts. Put a stated minimum on the invoice so a short job that still cost a round trip does not get billed as if it were free.
What happens if the fascia is rotten under the old gutter?
Quote a per-foot fascia repair rate on the estimate as a conditional line with no quantity, then fill in the quantity on the invoice once the old gutter is off and the wood is visible. Photograph it, note the time the customer approved the work, and give it its own numbered line rather than enlarging an existing one.
Does the invoice need to say what gauge aluminum I used?
It should. Builder-grade .027 and heavier .032 look identical from the street and behave differently under a ladder, a snow load, or a falling branch. Naming the gauge, the profile, the color, and the hanger spacing tells a customer comparing two bids what the price difference actually bought.
When should a gutter customer pay the balance?
At the final walkthrough, the same day the work finishes. Run water through the system while the customer watches, hand over the invoice, and take payment on the spot with a card or a scanned payment link. Collect a deposit up front on copper, 6-inch, custom colors, or large guard orders, since that material cannot be resold.
This article is general information, not professional or tax advice.
How do I actually get paid?
The part that gets you paid
An invoice in under a minute, on your iPhone.
Pick a client, add a line, send a clean PDF — or say it in words and confirm the draft. Your own pay-me link goes on as a QR code. Free to start; unlimited invoices and your own branding are Pro.
On-device · No account · Data Not Collected