Fence Installation Estimate Template

Updated July 28, 2026 · ~13 min read · Ilura Technology

Fence Installation Estimate Template That Shows Post Count

Short answer: A fence installation estimate template prices the run by the linear foot but shows the post count underneath it. Divide each run by your post spacing, round up, add one post per run, and add two more for every gate. Then price the holes: a 10-inch by 30-inch hole with a 4x4 in it takes about 2.6 bags of 60-pound mix. Slope, utility locates, demolition of the old fence, and each gate get their own lines.

A linear-foot price is how fencing gets sold and it is also how fencing gets underbid, because the foot is not what costs you money. The post is. Two backyards can measure the same 174 feet and differ by ten holes, ten sets of concrete, and half a day, purely because one has more corners and a gate in the wrong place. An estimate that only shows dollars per foot hides that from the customer and, more dangerously, from you. The line descriptions you settle on here are the same ones that will eventually appear on the bill, and what an invoice has to include starts from whatever you wrote on the estimate.

What belongs on a fence installation estimate?

Nine lines, and the first one is not a price.

LineUnitWhy it exists
Utility locate and tolerance-zone hand diggingLot, or per hourLegally required, and it changes how the holes get dug
Demolition of existing fenceLinear feetPulling old footings can take longer than setting new posts
DisposalPer loadOld chain link, treated wood, and concrete are three different destinations
Fence run, installedLinear feet, with post count shownThe volume line, built from bays
Terminal, corner, and gate postsEachBigger post, bigger hole, more concrete
Slope handlingLinear feet of the affected runRacking or stepping is extra cutting and extra layout
GatesEachNever per foot, and never bundled into the run
Hardware and finishLot, or per gateHinges, latches, drop rods, post caps, stain
Site restorationLotSpoil from twenty-four holes has to go somewhere

Across the top: the property address, an estimate number, the date, the expiration, the total linear footage, the height, and the material. At the bottom: exclusions, conditionals, and a signature line with the deposit amount.

How do I turn a run into a post count?

Break the perimeter into runs first. A run is a straight stretch between two direction changes or two gates. Then for each run: length divided by your maximum spacing, rounded up, is the bay count; bays plus one is the post count.

Max post spacingBays on a 100 ft straight runPosts on that run
6 ft1718
7 ft1516
8 ft (common for wood privacy)1314
10 ft (residential chain link line posts)1011

Tightening spacing from 8 feet to 6 feet on 174 feet of fence adds roughly seven posts, seven holes, fourteen more bags of mix, and the hours that go with them. That is a real decision with a real number attached, and it should be an option on the estimate rather than something you quietly absorb.

Two more counting rules. Every gate opening consumes two posts, and a drive gate wants 6x6s rather than 4x4s; where a gate sits between two runs, the same post serves both sides, so count it once. Corners are terminal posts too, and on chain link they need tension bands and a brace assembly that line posts do not.

How much concrete does each hole actually take?

More than most estimates allow for, which is why the mix is a line and not a rounding error.

Depth is set by rule, not by preference: roughly one third of the above-grade post height, or below the local frost line, whichever is deeper, with 24 inches as a common floor. A 6-foot fence in a no-frost market gets 24 to 30 inches; the same fence in frost country often gets 36 to 42. Hole diameter runs about three times the post width, so a 4x4 wants a 10 to 12 inch hole.

HolePostNet concrete60 lb bags80 lb bags
10 in dia × 24 in deep4x40.92 ft³2.11.5
10 in dia × 30 in deep4x41.15 ft³2.61.9
12 in dia × 36 in deep6x61.73 ft³3.82.9
12 in dia × 42 in deep6x62.01 ft³4.53.4

Twenty line posts at 30 inches plus four gate posts at 36 inches is about 51 bags of 80-pound mix — more than two thousand pounds of material to buy, deliver, carry to each hole, and mix. Put the bag count in your own working notes even if the customer only sees a dollar figure, because that is the number that tells you whether one truckload covers the job. On larger commercial runs the arithmetic flips to yards and a mixer, at which point the volume math in a concrete estimate is the one you want.

What does the slope of the yard do to the labor?

It decides whether panels rack, step, or get cut one picket at a time.

Racking means the rails follow the grade and the pickets stay plumb. Stepping means each bay stays level and drops at the post, leaving a triangular gap under the low side. Wood racks fairly well; vinyl and welded aluminum panels rack only within the manufacturer’s stated limit and often not at all, which forces stepping — and stepping is what generates the callback, because nobody warned the customer about the gap the dog can get through.

Fall across a runWhat you doEffect on that run
Under 6 inAbsorb it in the bottom gapBaseline
6 to 18 inRack wood, or step panel systemsAdd 10 to 20 percent
18 to 36 inStep every bay, cut pickets to gradeAdd 30 to 50 percent, and get the gap approved in writing
Over 36 in, or terracedStep-downs, taller pickets, sometimes retainingDo not price this from a phone call — walk it

Write the fall on the estimate in inches, per run. “Yard slopes a bit” is not a measurement, and it is not a defense when the customer asks why the last three feet look different.

Which lines have to sit outside the per-foot price?

The ones that vary independently of length. Gates lead that list. A 4-foot walk gate and a 10-foot double drive gate on the same job are two different builds — the drive gate needs oversized posts, deeper footings, a drop rod, heavy hinges, and usually a diagonal cable brace to keep it from sagging in year two. Gates are where warranty work comes from, so they get priced per unit with the hardware named.

Demolition is the second. Removing 88 feet of old chain link means pulling eleven concrete footings, and a footing poured in 1974 comes out slower than a new post goes in. Price demo by the foot and footing extraction per unit.

Material choice changes what you are counting, not just what you pay.

MaterialSold asThe number that drives your estimate
Pressure-treated pine privacyPosts, rails, picketsPickets per foot: 2.18 for side-by-side 1x6, about 2.7 for board-on-board, roughly double for shadowbox both faces
CedarSame structureSame picket math, higher unit cost, plus culling waste on crooked boards
VinylRouted 6 or 8 ft sectionsPost spacing is fixed by the panel — layout error is unrecoverable
Chain link50 ft fabric rolls, line posts to 10 ft o.c.Terminal posts, tension bands, top rail, and tie count
Aluminum ornamentalPanel sections, rackable or notWhether the panel racks decides how the slope gets handled

What can’t be quoted until the locates are marked?

Anything that depends on what is under the ground you are about to auger through.

Calling 811 before digging is required by state law, it is free, and it is the step that separates a fence job from a gas leak. PHMSA’s damage prevention material puts it plainly: the call lets each affected operator come out and mark their underground facilities, and it applies to every digging project, including small ones — see PHMSA’s call before you dig page. Notice periods are typically a couple of business days and the marks expire, so a job that slips three weeks needs a fresh ticket.

The estimate consequence is real money. Inside the tolerance zone around a mark, you hand dig. A hole that takes four minutes with an auger takes twenty-five with a shovel and a probe, and if a marked line runs the length of the fence, half your holes just changed method. Write it as a conditional hourly line rather than eating it.

UnknownWhat it doesHow to write it
Marked utility inside the fence lineHand digging, possible route changePer hour, or per hole, applied after marks appear
Rock or hardpanAuger stops, rock bar or a core drill comes outPer hole, quoted at the first refusal
Tree roots in the lineCut, or shift the post and change bay spacingPer hole, plus a note that spacing may vary
Old footings from a previous fenceExtraction, not just removalPer footing
Property line uncertaintyYou are not a surveyorExcluded; survey is the customer’s responsibility
HOA or municipal approvalHeight, material, and which side faces outExcluded; customer supplies approval before scheduling

What does a filled-in fence estimate look like?

A 174-foot backyard enclosure in 6-foot pressure-treated privacy: three runs of 68, 44, and 48 feet, a 4-foot walk gate, a 10-foot double drive gate, 22 inches of fall across the middle run, and 88 feet of existing chain link to remove.

Working numbers behind the price: 160 feet of actual fence after the 14 feet of gate openings; 24 holes total, being 20 line posts in 10 × 30 inch holes and 4 gate and terminal posts in 12 × 36 inch holes; about 51 bags of 80-pound mix; 349 pickets before waste, so 360 ordered; 480 linear feet of 2x4 rail.

The rates below are placeholders so you can see the structure. Substitute your own crew cost, your own lumber quote, and your own overhead.

ESTIMATE #F-2026-0342 Rail & Post Fence Co. Site: 27 Halloway Court · Prepared July 9, 2026 · Valid through August 8, 2026

#DescriptionQtyRateAmount
1Remove existing 4 ft chain link incl. 11 concrete footings88 lin ft$6.50$572.00
2Haul and disposal of demo material1 load$165.00$165.00
3Fence installed — 6 ft PT pine privacy, 20 line posts 4x4 set 30 in in concrete, three 2x4 rails, dog-eared 1x6 pickets160 lin ft$36.00$5,760.00
4Terminal and gate posts — 6x6 set 36 in in 12 in holes4 ea$95.00$380.00
5Slope — step middle run over 22 in of fall, six bays, pickets cut to grade44 lin ft$6.00$264.00
6Walk gate, 4 ft — welded frame, three hinges, gravity latch1 ea$395.00$395.00
7Drive gate, 10 ft double — heavy hinges, drop rod, cable brace kit1 ea$1,150.00$1,150.00
Total$8,686.00

That is $49.92 per linear foot across the whole enclosure. Installed wood privacy commonly falls somewhere in the mid-$20s to around $60 per foot depending on region, height, material grade, terrain, and how many gates and corners are in the layout — use that only to check that your own buildup has not gone sideways, never as the price itself.

Post schedule shown to the customer: 24 posts total. Line posts at a maximum of 8 ft on center, actual spacing 7.6 ft on the north run, 7.3 ft on the sloped run, 8.0 ft on the south run.

Not included: survey or property line staking, HOA or permit fees, removal of vegetation along the fence line, sprinkler repair, staining or sealing, grading, gate automation or electrical.

Conditional lines: hand digging inside utility tolerance zones at $85 per hour. Rock or hardpan at $75 per affected hole, quoted at first refusal and confirmed with you before we continue. Additional footing extraction at $35 each beyond the eleven listed.

Site note: spoil from 24 holes is spread on site unless haul-off is requested. Marks from the 811 ticket must still be visible on the scheduled start date, or the ticket is refreshed and the start moves.

How do I build the per-foot number instead of copying one?

Price one bay, then multiply. A bay is one post, one hole, roughly two bags of mix, three rail sections, and about seventeen pickets. That is the whole trade, repeated.

Soil and accessCrew-minutes per bay, two-person crew
Loose soil, machine auger, drive-up access25 to 35
Clay or mixed fill, one-man auger, gate access only40 to 55
Rock, roots, or hand digging near a marked line60 to 120

Time a bay on your next job with a stopwatch and you never need anyone else’s per-foot price again. Multiply bay minutes by your fully loaded crew cost per hour — both bodies, payroll taxes, insurance, the truck, the trailer, the auger, and the hours nobody pays you for — then add the material in that bay.

Then set the price, and set it by margin rather than markup. Adding 20 percent to cost gives you a 16.7 percent margin, not 20. If you want to keep 30 percent of the invoice, divide your cost by 0.70. On a bay that costs $118 all in, a 20 percent markup bills $141.60 and leaves $23.60; dividing by 0.70 bills $168.57 and leaves $50.57. Across 24 bays, that difference is the whole profit on the job.

What happens to the estimate once it is signed?

It turns into a deposit, a material order, and a balance due, and each of those is a different piece of paper. Fencing runs on deposits more than most trades because the lumber gets bought before the first hole is dug, so put the deposit amount and the balance terms on the face of the estimate and treat the acceptance signature as the start of the collection clock — the practices in getting clients to pay work far better when they were written into the estimate than when they are introduced afterward.

Keel is an iOS app that runs entirely on your device: no account, no bank connection, no cloud, no login, and an App Store privacy label that reads Data Not Collected. When the last picket goes on you can raise the invoice from the truck in about a minute with your own logo, numbering, and brand color, and a payment link the customer scans as a QR code at the gate. The lumberyard receipt, the bag mix, the auger bits, and the fuel stop get photographed and read on device by Apple Intelligence. Fence work also generates a lot of short trips — the yard, the job, back to the yard for four more posts — and those miles are worth logging properly, which is what an independent contractor mileage log is for. Free covers unlimited invoices, receipts, and mileage; Keel Pro is a one-time $249.99 Lifetime purchase rather than a subscription. You can get it on the App Store.

Frequently asked questions

How do I calculate how many fence posts I need?

Split the perimeter into straight runs, divide each run by your maximum post spacing, and round up to get the bay count. Bays plus one gives the posts for that run. Add two posts per gate opening, and count a shared post only once where a gate sits between two runs. Corners and ends are terminal posts, not line posts.

How many bags of concrete does one fence post take?

For a 4x4 in a 10-inch hole dug 30 inches deep, about 2.6 bags of 60-pound mix or 1.9 bags of 80-pound. A 6x6 gate post in a 12-inch hole at 36 inches takes roughly 3.8 or 2.9 bags respectively. Multiply by your hole count before you order, because carrying twenty extra bags back is nobody’s favorite afternoon.

Should a fence estimate be priced per linear foot or per section?

Show both. Sell the run by the linear foot because that is what customers compare, but print the post count and spacing underneath so the number is defensible. Gates, terminal posts, demolition, and slope handling stay as separate lines. A pure per-foot quote hides the fact that corners and gates, not length, drive most of your labor.

Do I have to call 811 before digging post holes?

Yes. It is required by state law before any excavation, including small residential jobs, and the call is free. Operators come out and mark their underground lines, which typically takes a couple of business days, and marks expire. Inside the tolerance zone around a mark you dig by hand, so put hand digging on the estimate as a conditional hourly line.

How does a sloped yard change a fence estimate?

It changes method and cutting time. Under six inches of fall you absorb it in the bottom gap. Between six and eighteen inches you rack wood or step panels, adding roughly ten to twenty percent to that run. Beyond eighteen inches you step every bay and cut pickets to grade, which adds thirty to fifty percent and leaves gaps the customer must approve first.

What should a fence estimate say about removing the old fence?

Price removal by the linear foot and footing extraction separately, because old posts set in concrete come out slower than new posts go in. State the disposal destination and cost per load, since treated wood, chain link, and concrete often go to different places. Add a conditional rate for extra footings found beyond the count you could see.


This article is general information, not professional or tax advice.

The estimate → The invoice

How do I bill for it?

Turning agreed work into a document that gets paid.

Appliance Repair Invoice Example: Every Line Explained A filled-in appliance repair invoice example from a two-visit fridge job: the diagnostic credit, the parts line, the return trip, and the disputed lines. Continue →

Once they say yes

Turn the agreed number into an invoice.

Describe the work in a sentence — "invoice Acme $1,500 for a brand sprint" — and Apple Intelligence drafts it on device for you to confirm.

On-device · No account · Data Not Collected